background image

Page 1

Fabric Building

Model# FB335017P

33’x50’x17’

W10.0x L15.25 x H5.2m

Assembly Instructions

Summary of Contents for FB335017P

Page 1: ...Page 1 Fabric Building Model FB335017P 33 x50 x17 W10 0x L15 25 x H5 2m Assembly Instructions ...

Page 2: ...Page 2 RECOMMENDED TOOLS Equipment List Speed Wrench 22 23 24 Hammer 30lb Rope 12 Long Tape 50m Hammer Drill 1 Lifter 2 Crane 1 Forklift 1 Protective equipment ...

Page 3: ...ry and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structure Location sh...

Page 4: ...5th arch 8 3A shoulder truss for 1st and 6th arch 4 4 upright truss 12 5 purlin 35 6 connection plate for steel wire No 21 No 21A 20 7 tensioning tube for roof cover 5 1 pcs set 2 sets 8 corner base plate left right for 1st and 6th arch installed with ratchet 4 9 interior base plate for 2nd to 5th arch installed with ratchet 8 10 tube clip for steel wire No 21 No 21A 40 11 bolt M8x60 for truss swa...

Page 5: ...ower left side of the front and back door 2 23 square tube post on the lower right side of the front and back door 2 24 square tube post on the upper left side of the front and back door 2 25 square tube post on the upper right side of the front and back door 2 26 connection plate for square tube post No 22 23 24 25 4 4 27 cross beam for front and back door 2pcs set 2 sets 28 vertical tube for doo...

Page 6: ... 37 bolt M10x50 for post and truss 8 38 bolt M6x40 for door bracing tube No 34 No 35 8 39 bolt M12x130 for square tube post No 22 23 24 25 20 40 bolt M10x70 for square tube post No 22 23 24 25 18 41 rope for front and back cover 5 bundles 2 packs 42 cable tie for fixing front and back cover 100 43 expansion bolt 16 44 steel wire for front and back door 2 bundles 45 steel wire clamp 8 46 door winch...

Page 7: ...diagram to mark the position of base plate The measurement is from center to center of base plates Referring to the diagram and confirm the place of base plates ENSURE THAT THE FOUNDATION IS SQUARE Note The expansion bolt No 18 No 43 applies for fixing base plate on concrete ground ...

Page 8: ...Sixth Arch and Front Back Wall 1 Find Trusses No 1A 2A 3A 4 for first and sixth arch and connect them by bolt M8x60 No 11 2 Find relative parts of posts and rails for front and back wall and assemble them according to the below diagram ...

Page 9: ...Page 9 Second Arch to Fifth Arch Installation 3 Find Trusses No 1 2 3 and 4 for second to fifth arch and connect them by bolt M8x60 No 11 ...

Page 10: ...second arches install purlin No 5 and connect them by bolt M10x70 No 12 Then the third arch and purlins In this turn one arch and then purlin tubes until the sixth arch 6 Install steel wires No 21 No 21A between arches by steel wire turnbuckle No 19 steel wire clamp No 20 connection plate No 6 and tube clip No 10 7 Wrap every truss joint by duct tape No 17 to protect roof cover ...

Page 11: ...Page 11 C INSTALLING COVER Front Back Cover and Winch Door Installation Install the winch door refer to the diagram bellow Winch Door Installation ...

Page 12: ...Page 12 1 Install the front door frame and door winch bracket 2 Fix the winch to the bracket Make sure the winch handle faces the outside Refer to Figure 1 ...

Page 13: ... direction The side with pipe pockets faces inward 4 Connect the door bracing tube 2pcs set with M6x40 bolt 5 Thread the door bracing tube into the pocket from top to bottom Pay attention to the bottom bracing tube There are holes on both sides for fixing steel wire rope Refer to Figure 2 ...

Page 14: ...r frame and on the same plane as the pulley and then the steel wire rope sags naturally Keep the length of both sides equal and naturally sag to the ground 7 Fix each end of steel wire rope to the hole on bottom bracing tube with steel wire clamps Make sure fix it firmly 8 Put the door bracing tube into the track from the gap at the bottom from top to bottom ...

Page 15: ...Page 15 9 Adjust the length of the steel wire rope to be equal on both sides Fix the wire rope fold to the hole in the winch Refer to Figure 4 4 ...

Page 16: ...16 10 Turn the winch clockwise to lift the door curtain cloth and bracing tubes to a position about 40 50cm away from the cross beam Lace the eyelets on the cloth to cross beam with a rope Refer to Figure 5 ...

Page 17: ...w the winch door installation is completed Turn the winch clockwise to raise and counterclockwise to lower the door The steel wire rope shall be evenly wound on the winch so that the door can rise and fall smoothly ...

Page 18: ...e Be sure doing not over pull the end of roof cover 2 Pull the roof cover over frame EVENLY CAREFULLY AND SLOWLY Insert tensioning tube No 7 into the pipe pockets Cut a small opening over against every base plate Put the belt No 14 around tensioning tube and go through ratchet on base plate and loosely secure DO NOT TIGHTEN Adjust the cover so that it is square and evenly centered on the frame Not...

Page 19: ...Page 19 Now your assembly is completed ...

Reviews: