background image

State: 19.09.2017 p.  4

Mounting instruction climbing equipment „Tamino 2“

Item-No. 51 5560 601

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

5.  Place the head of the catarpillar as described in diagramm 2 and 4 

onto the foundation. 

Note: Do not screw the base plates onto the foundations yet! 

6.  Cennect the slide with the palps of the caterpillar and align the 

head of the caterpillar pnce more. 

7.  Place the balance board and the other hexagons according to the 

postitions in diagram 3. 

8.  Add the addition parts (double bow, ladder bow, climbing bow  

and climbing net) as shown in diagram 1 and connect it with the 
screws included in the delivery. 

9.  Align the play equipment once more on the foundations. 

Note

: Avoid sagging of the climbing net.

10. Drill holes into all foundations and screw the play equipment into 

the foundations with the included heavy-duty dowels.

11.  Fill up and compress the holes between the foundation and the 

foundation hole with the excavation.

Diagram 3: Position of the elements

1333

296 535

7358

2873

450

3432

1881

27°

27°

27°

795

307

802

27°

798

303

1384

2175

3034

4331

330

849

307

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

2

 

Tamino 2

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Übersicht

1014-00-00

1045.7

Maßstab

Schramm

27.06.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Reviews: