background image

State: 19.09.2017 p.  2

Mounting instruction climbing equipment „Tamino 2“

Item-No. 51 5560 601

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: 6250mm x 10200mm mm). 

2.  Carry out excavation work for 14 foundations as shown in Diagram 2.  

After excavation, compress the foundation floor.

 

Note: 

The combination equipment is built in on the play level. Pay attention 

to items marked „game level” of play equipment!

3.  Setup the main foundation (T-form: LxWxH 1350x1000x300mm), and the 

foundation for the climbing bow (LxWxH 600 x 800 x 300mm), the foundation 
for the climbing net (1100 x 300 x 300mm), the foundation of the slide (800 x 
600 x 300mm) and the 10 other foundations acc. to the dimensions indicated 
in diagram 2 the quality class C 20/25 with horizontal reinforcement. 

4.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size - clean the surface of the foundations and start with the instal-
lation of the combination equipment.

Diagram 2: Side view with dimensions „Tamino 2“

Reinforcement plan:

Concrete foundation with reinforcement
Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Foundations for attachment parts are no-reinforced

300

7390

450

239

1469

2421

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

Tamino 2

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:30

A3

Gewicht

Name

Name

Fundament

1014-00-00

14962.0

Maßstab

Behnke

18.08.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

Concrete

Füllmaterial

Filling

Erde

Ground

Legende

Reviews: