© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved
State: 16.12.2020 p. 2
Mounting instructions for hypnotic wheel „devo“
Item No. 51 5212 401
play
1. Select the location of the play equipment taking into account the play area.
Note:
Please make sure that there is a minimum distance of 1.50 m to the
impact protection areas of other play equipments.
2. Carry out excavation work for the foundation as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The play equipment is installed at play level. Pay attention to items
marked „play level“ at play equipment!
3. Set up the concrete foundation acc. to diagram 2 with central, horizontal
reinforcement.
4. After a setting period of 10 - 14 days, depending on weather conditions and
foundation size, fill up and compress the holes beetween foundation and the
foundation hole with excavation.
5. Clean the surface of the foundation, place the play equipment on it and screw
the play equipment to the foundation using the included heavy-duty dowels.
Diagram 2: Foundation plan
500
600
1000
450
2060
1262
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
devo
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
1604-00-00
Maßstab
Schramm
28.06.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
04.11.20
beliebiger Boden
A
Datum
Änderung
Rev
beliebiger Boden
optional floor
500
600
1000
450
2060
1262
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
devo
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
1604-00-00
Maßstab
Schramm
28.06.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
04.11.20
beliebiger Boden
A
Datum
Änderung
Rev
beliebiger Boden
optional floor
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Play level
Concrete
foundation