Mounting instructions for multiplay „angulus 5“

Item-No. 51 7525 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 2). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 

According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made 

on the entire impact area of every equipment that cause forced movement.

3.  Carry out excavation work for the foundations as shown in diagram 3.  

After excavation compress the foundation floor.

 

Note:

The combination equipment is installed at play level. Pay attention to 

items marked „play level” at play equipment!

4.  Set up the concrete foundations according to diagram 3 with central, horizon-

tal reinforcement.

5.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

6.  Clean the surface of the foundations and start with the installation of the play 

equipment. 

7.  Fix the post shoes to the post using the screws included in the delivery, do 

not tighten yet! Pay attention to the parallel alignment of the wooden surface 
and the stainless steel plate (see diagram 6e).

8.  Screw the two upper hexagons to the two lower hexagons at the intended 

position (see diagram 4).

Diagram 2: Top view

 R1500 

 R1500 

 1500 

 910 

 9000 

 5460 

 5500 

 8300 

 8500 

 4185 

 2000 

 500 

 500 

 8300 

Fallschutzplatten

required safety slabs

Aufprallfläche

Impact area

mind. Fallschutzplatten

min. required safety slabs

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

angulus5

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

Rev

Änderung

Datum

1:50

A3

Name

Name

Draufsicht

1022-00-00

Maßstab

Behnke

28.02.17

 

 

A Mindestraum geändert

14.12.18 SI

SI

23.11.20

Aufprallfäche angepasst

B

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Area of the minimum space = 

Impact surface when using natural floors with a 

 

shock-absorbing effect.

When using synthetic impact protection the impact area 

shortens in the direction of the swing by 500 mm each. 

The minimum space remains preserved in its entirety.

Reinforcement plan: 

Concrete foundation with reinforcement

Foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C20/25 – C25/30

Summary of Contents for angulus 5

Page 1: ...o 51 7525 601 stilum GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing balls swing parallel bars slide hexagons climbing eye post climbing net Diagram 1 Overall view of the play equipment post shoe ...

Page 2: ...ation size fill up and compress the holes between the foundation and the foundation hole with excavation 6 Clean the surface of the foundations and start with the installation of the play equipment 7 Fix the post shoes to the post using the screws included in the delivery do not tighten yet Pay attention to the parallel alignment of the wooden surface and the stainless steel plate see diagram 6e 8...

Page 3: ... 02 17 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland Beton concrete gewachsenes Erdreich natural ground Legende stoßdämpfender Boden shock absorbing floor C stoßdämpfender Boden 27 08 20 ES B Schaukelfund Höhe geän 27 06 19 SI SI 14 12 18 Schaukelfundament geän A Datum Änderung Rev 6034 400 2925 823 1745 450 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTER...

Page 4: ...e delivery dia gram 4 12 Align the wooden part on the foundations as shown in diagram 1 and 3 Note Do not screw the base plates onto the foundations yet 13 Set up the swing frame Screw the swing diagram 5a to the swing beam using the supplied bolt and connect it with the upper hexagons at the inten ded location diagram 1 and 3 use the screws included in the delivery Attach chains with swind seat t...

Page 5: ...e Verbindung 1 3 6 2 83 362 2195 2463 49 6 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH 1 angulus Benennung Ge...

Page 6: ...ng balls climbing eye Diagram 6c Attachment part climbing net B 1 10 F G H B 1 10 F B C E C 1 10 E 1 10 F 1 20 G 1 10 OHNE SCHRIFT TECHNISCHE UNTE ZUGÄNGLICH GEMA WENDET WERDEN Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH angulu Benennu Gepr Werkstoff Datum Projekt Gez Zuschnitt Zeichnun Rev Änderung Datum Gewicht Name Name Übers 1022 0 x xx xx xx Gewerbegebiet Larsheck 56271 K...

Page 7: ...e Especially areas which can not be reached by rainfall should be frequently cleaned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time D...

Page 8: ...ommended to clean and or glaze at every 6 to 12 months or to shorten the cleaning interval to 3 to 6 months if the wheather conditions are bad LASUR Use a soft and flat brush or and a glaze application roll to paint The wood should be cleaned a few hours before glazing That can be done with mild javel water which should in any case be rubbed off afterwards For resistant dirt use a wood cleaner Eve...

Reviews: