background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

Mounting instructions for swing „patis2“ robinia 

Item-No. 51 2014 601

State: 14.06.2016 p. 1

 

Diagram 1: Overall view of the play equipment 

Swing bar

Post

Summary of Contents for 51 2014 601

Page 1: ... 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for swing patis2 robinia Item No 51 2014 601 State 14 06 2016 p 1 Diagram 1 Overall view of the play equipment Swing bar Post ...

Page 2: ...St 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 1000 1000 1000 500 1100 1100 450 Beton Concrete Füllmaterial Filling Erde Ground Rev Projekt BESTELL NR ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTI...

Page 3: ...pension Readjust the screws on the swing bars 9 Do not allow children to use the equipment before the installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to par ticular risks of injury for the user For this reason make clearly visible that the equipment shall not be used in ...

Page 4: ...be frequently clea ned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over st...

Reviews: