4
Operation
Procedure in emergencies
6
5
6210_003-052_V3
555
1
4391
00
1
1.
2.
– Place the hand wheel with the tappet lugs
(5) on the tappet (6) and press down against
the spring force.
NOTE
Do not rotate the hand wheel to the stop,
because this will trigger the relubrication
device.
– To apply the parking brake rotate the hand
wheel clockwise until the force needed
increases markedly and the truck is held
securely. The effort required is not great.
– To release the parking brake rotate the
hand wheel anticlockwise a maximum of
5 revolutions until the hand wheel can be
turned easily.
After manual operation, the hand wheel is to
be returned to its latch position and the cover
to its normal position.
6036Ba-026
5060_003-070
Towing
DANGER
The brake system on the towing vehicle may fail.
There is a risk of accident!
If the brake system of the towing vehicle is not
adequately sized, the vehicle may not brake safely
or the brakes may fail. The towing vehicle must be
able to absorb the pulling and braking forces from
the unbraked towed load (total actual weight of the
truck).
– Check the pulling and braking forces of the
towing vehicle.
DANGER
The truck could drive into the towing vehicle when
the towing vehicle brakes. There is a risk of acci-
dent!
If a rigid connection has not been used for power
transmission in two directions during towing, the
truck may drive into the towing vehicle when the
towing vehicle brakes. For safety reasons, only a
tested tow bar may be used.
– Use a tested tow bar.
300
171533 EN - 02/2019 - 19
Summary of Contents for RX60-35/600
Page 2: ......
Page 4: ......
Page 14: ......
Page 15: ...1 Foreword ...
Page 38: ...1 Foreword Environmental considerations 24 171533 EN 02 2019 19 ...
Page 39: ...2 Safety ...
Page 71: ...3 Overviews ...
Page 73: ...Overviews 3 General view 171533 EN 02 2019 19 59 ...
Page 86: ...3 Overviews Operating devices and display elements 72 171533 EN 02 2019 19 ...
Page 87: ...4 Operation ...
Page 384: ...4 Operation Decommissioning 370 171533 EN 02 2019 19 ...
Page 385: ...5 Maintenance ...
Page 392: ...5 Maintenance General maintenance information 378 171533 EN 02 2019 19 ...
Page 396: ...5 Maintenance General maintenance information 382 171533 EN 02 2019 19 ...
Page 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 171533 EN 02 2019 19 ...
Page 433: ...6 Technical data ...
Page 458: ...6 Technical data Fuse assignment 444 171533 EN 02 2019 19 ...
Page 469: ......
Page 470: ...STILL GmbH 171533 EN 02 2019 19 ...