Operation
5
Working with loads
R70-40T
approx.
10,500 kg
R70-45T
approx. 11,500
kg
R70-50T
approx.
12,100 kg
7090_001-009
Driving on loading bridges
DANGER
Risk of accident!
– Before driving across a loading bridge, ensure
that it is properly attached and secured and has
adequate load-bearing capacity (lorry, bridge).
– Drive on the loading bridge slowly and cau-
tiously.
– Ensure that the lorry onto which you will be dri-
ving is secured to prevent its shifting and can
support the load of the forklift truck.
The lorry driver and the forklift truck driver must
agree on the departure time.
171673 [EN]
115
Summary of Contents for R70-40T
Page 2: ......
Page 11: ...1 Foreword ...
Page 18: ...1 Foreword Environmental considerations 8 171673 EN ...
Page 19: ...2 Introduction ...
Page 25: ...Introduction 2 Residual risk 171673 EN 15 ...
Page 29: ...3 Safety ...
Page 49: ...4 Overviews ...
Page 51: ...Overviews 4 General view 171673 EN 41 ...
Page 63: ...5 Operation ...
Page 186: ...5 Operation Shut down 176 171673 EN ...
Page 187: ...6 Maintenance ...
Page 248: ...6 Maintenance 3000 hour maintenance two year maintenance 238 171673 EN ...
Page 257: ...7 Technical data ...
Page 265: ...8 Circuit diagrams ...
Page 266: ...8 Circuit diagrams Hydraulics Hydraulics Hydraulic circuit diagram 7071_003 083 256 171673 EN ...
Page 280: ...8 Circuit diagrams Electrical equipment 270 171673 EN ...
Page 287: ......
Page 288: ...Still GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 171673 EN ...