Operation Manual
26
Dock Leveller ED
There are several option for the control boxes. Therefore the images of
the control box in this manual may differ from the installed control box. The
advanced control boxes have extra buttons. Some options require an extra
button on the control box, see Operator panel buttons and functions
5.2 Operation procedures
In parked position the deck stands upright. A control box controls the
functioning of the Dock Leveller. The standard control box has a main switch
and a push button. The main switch is used to power the system, but can also
be used as an emergency switch. When pressing the push button in the parked
position, the deck will move further up and releases the locking mechanism
for a limited time. After releasing the push button the deck will lower until it
touches an obstacle, for instance the loading floor of the truck. The deck is then
floating, it follows the up and down movement of the truck. Pushing the push
button again the deck will rise, when reaching the upright position the locking
mechanism will hold the deck in this parked position.
Operators and service engineers must be familiar with all safety aspects. To
ensure the safety of the personnel, you must read and understand the chapter
on page 8 before performing any tasks on the Dock Leveller.
5.2.1 Switching on
5.2.1.1 Starting
To start the Dock Leveller.
1. Switch on the main power supply by switching the main switch to "1".
2. Briefly push [deck up] to activate the control current.
Do not use the main switch during normal operation. Only switch to "0" in case
of an emergency or a dangerous situation.