Bay size
Operation & maintenance instructions (Version H)
34
SKY-200/250
4.4
Bay size
Note
n
If a covering layer of mortar and/or tiles has been applied to the concrete floor, then
chemical anchors of sufficient length should be used. The anchors must be at least
that much longer than the thickness of the covering layer.
Note
n
Care should be taken for drainage of the bay area.
Note
n
It is the responsibility of the user to ascertain whether the quality of the concrete floor
is adequate.
Note
n
The required ceiling clearance must be: 69" + height of the vehicle to be rise
height of the jacking beams.
1.
To optimize shop space, first locate a vehicle in the bay prior to layout.
Note walkway's, escape path, overhead obstructions, and ability to move equipment
in the bay area.