920011-649
Operator Manual
Installation Verification
2.1.4 Seismic Anchorage
System (Accessory)
A seismic anchorage system (accessory; based on California
requirements) is available for high-risk seismic zones.
2.2 Installation
Verification
An equipment drawing (920-011-656), showing all of the utility and
space requirements, was shipped after the order for this equipment
was received. The clearance space specified on the equipment
drawing is necessary for proper installation, operation and
maintenance.
Uncrating/Installation Instructions
(P920011-648) are
provided with the processor. If these documents are missing or
misplaced, contact STERIS and provide the serial number of the
processor. Replacement copies will be shipped promptly.
After installing the equipment according to the
Uncrating/Installation
Instructions
, complete the following checklist to help ensure
complete and correct installation, or contact STERIS to schedule a
service technician to test your installation and demonstrate proper
equipment operation.
�
Shutoff valves (not provided by STERIS), capable of being
closed for maintenance purposes, are installed on the water
lines. Shutoff valves must be compliant with the local
occupational health and safety regulations, as well as electric
and plumbing codes.
�
Disconnect switches (not provided by STERIS), capable of being
locked in OFF position for maintenance purposes, are installed
in electrical supply lines near the processor. Disconnect
switches must be compliant with local occupational health and
safety regulations, as well as electric codes.
NOTE: If processor is installed next to other equipment, shutoff
valves and disconnect switches should be located so service can
be shut off to one piece of equipment at a time.
�
Processor is positioned, as shown on equipment drawing, with
required clearance space and in relation to building supply
lines.
�
Processor is level. Adjust leveling casters if necessary.
�
Dual Pre-Filter and Pressure Regulator Assembly (required
accessory), pressure gauge and manual ball valve (with dual
pre-filter kit) are installed as specified on equipment drawing.
�
Measure building hot and cold water supply pressures at shutoff
valves. Pressure readings must be within specifications on
equipment drawing.
•
If water pressure is lower than equipment drawing
specifications:
A water pump with a pressurized tank (not
provided by STERIS) is needed to increase water pressure.
•
If water pressure is higher than equipment drawing
specifications:
Dual Pre-Filter and Pressure Regulator
Assembly (required accessory) can be adjusted to regulate
high water pressure to specified pressure.
Summary of Contents for P920011-649
Page 1: ...OPERATOR MANUAL Reliance EPS Endoscope Processing System 2022 03 10 P920011 649 ...
Page 2: ......
Page 13: ...xi 920011 649 Operator Manual Table of Contents ...
Page 17: ...xiv 920011 649 Operator Manual List of Tables Healthcare Capital Equipment ...
Page 25: ...1 8 920011 649 Operator Manual Safety Precautions Healthcare Capital Equipment ...
Page 45: ...3 16 920011 649 Operator Manual Component Identification Healthcare Capital Equipment ...
Page 167: ......
Page 168: ...STERIS Corporation 5960 Heisley Road Mentor OH 44060 1834 USA 440 354 2600 800 548 4873 ...