5 Test
list
All relevant tests must be carried out before using the device. The staff
carrying out the test must have exact knowledge of the operating manual.
The device is completely assembled and connected up.
5.1
Test before starting the device every time
Remove all tubes from the connections
Visually check the pressure gauge for O
2
and AIR
All pressure must be in the correct range ( > 3 bar ).
Check the device for any signs of damage
Check the mains lead and electrical devices for any external signs of
damage
Visually check the LEDs
5.2
Test before every patient
Check O
2
concentration
Visually check the pressure gauge for O
2
and AIR
All pressure must be in the correct range ( > 3 bar )
The device must not be used if it fails any of the tests!
Prerequisites for the
test
Check pressure
Check condition of
device
Danger