
11 Care and maintenance
220
GA-070T-0518V2.7-HAO-EN
Fritz Stephan GmbH
Preparing the PNT B
11.7.1.1
1.
Pull the pressure measurement lines off the PNT connectors.
2.
Carefully pull both vortex bodies out on both sides of the flow
sensor using the assembly tool.
Fig. 110: Preparing the PNT B
1
Pressure measurement line
5
Vortex body
2
Connector 1
6
Hook
3
Connector 2
7
PNT B assembly tool
4
Pneumotachograph
Preparing the PNT B
Summary of Contents for EVETR
Page 1: ...EVETR Transport Ventilator Instructions for use...
Page 32: ......
Page 40: ......
Page 86: ......
Page 106: ......
Page 124: ......
Page 192: ......
Page 210: ......
Page 234: ......
Page 240: ......
Page 246: ......
Page 253: ...17 Notes Fritz Stephan GmbH GA 070T 0518V2 7 HAO EN 253 17 Notes...