background image

Installation Instructions 21078501 Rev C

Tools required:

Page 1 of 2

#2 Phillips

Power Drill

7/16"

1

Vertical Processor Sling, Fixed Mount

Compatible with c:scape and Frameone worksurfaces

CPRSLFO

V

ertical Processor Sling 

| Installation Instructions

Place base bracket on underside 
of worksurface with slot towards 
the rear of the desk and base 
bracket no more than 1/4" from 
the cantilever to allow maximum 
clearance between CPU and desk 
leg. Install with four (4) 5/8" long 
screws (included).

Insert one (1) bolt through sling 
support bracket and loosely install 
the nut on the opposite side.

Thread straps through sling 
support bracket and place 
assembly onto the CPU.

SCREW

BASE

BRACKET

SLOT

Setback the base bracket, as shown, 
to allow the CPU to be flush with the 
front edge of the worksurface.
For example: Setback 6-3/4" when 
using an 18" deep CPU.

2

3

BOLT

NUT

STRAP

2

3

CANTILEVER

1

Reviews: