
Page 18 of 18
939564905 Rev E
®
1
When connecting tables as stated in steps 8-9, 11-14, and 19-20 use this guide as a reference.
2
Connect the cables from the lifting columns to the cables provided. The other end should
be connected to the control box. Repeat this for each leg.
3
Connect the end of the controller cable into the control box.
4
Follow steps 8-9,11-14, and 19-20 to complete the wiring installation.
5
Once you have completed the wiring, use the wire managers to hold all the cables and
minimize possible entanglements.
Wiring Guide
LEFT LIFTING
COLUMN
FOOT
GLIDE
RIGHT LIFTING
COLUMN
CONTROLLER
CONTROL
BOX
lifting columns in any way.
•
Never
attach wires to the
NOTE:
Vertical wire management solutions are also available from Details.
Contact your local dealer or
Steelcase.com
for more information.