9
The machine is heavy, two people are required to
unpack and lift.
Use a safety strap to avoid tip over when lifting
machine.
Check shipping carton and machine for damage before
unpackaging. Carefully remove packaging materials,
parts and machine from shipping carton. Always check
for and remove protective shipping materials around
motors and moving parts. Lay out all parts on a clean
work surface.
UNPACKING & INVENTORY
Remove any protective materials and coatings from all
of the parts and the bandsaw. After cleaning, apply a
good quality paste wax to any unpainted surfaces.
Make sure to buff out the wax before assembly.
Compare the items to inventory figures; verify that all
items are accounted for before discarding the shipping
box.
If any parts are missing, do not attempt to plug in the
power cord and turn “ON” the machine. The machine
should only be turned “ON” after all the parts have been
obtained and installed correctly. For missing parts,
contact Steel City at 1-877-SC4-TOOL.
WARNING
!
WARNING
!
A.
Assembly
NOTE:
Your new SCTW Band Saw
is over 90% assembled.
SAW BODY ASSEMBLY
A