STATUS SCIENTIFIC CONTROLS
Installation, Commissioning & Routine Gas Testing
FGD4 Gas Detector
TD19/001
Issue:
5
Change Note:
1869
Page 11
5.
C
OMMISSIONING
Following completion of the installation:-
Replace the cover, taking care not to trap the wiring and fix with the 4 allen
screws, do not over tighten.
5.1.
Applying power
Once the installation is complete and the covers are secure then power can
be applied. The power source should be between 12 and 24 volts dc.