STATUS SCIENTIFIC CONTROLS
Installation, Commissioning & Routine Gas Testing
FGD10B Pellistor Gas Detector
TD18/008
Issue:
10
Change Note:
1904
Page 13
4.
C
OMMISSIONING
Following completion of the installation:-
Ensure that the front cover has not been contaminated with dirt - paying
particular attention to the thread. Replace the cover by rotating it several
times clockwise until it reaches its limit then secure using the locking screw,
turning in an anti-clockwise direction
– do not over tighten.
4.1.
Applying power
Once the installation is complete and the covers are secure then power can
be applied. The power source should be between 12 and 24 volts dc.