  note: 

This  unit  can  be  vented  with  PVC  pipe  materials 

(DWV ASTM-D2665  or  CSA  B181.2;  Schedule  40,  80,  120 

ASTM-D1785 or CSA B137.3; or SDR Series ASTM-D2241 or 

CSA  B137.3),  CPVC  pipe  materials  (CPVC41 ASTM-D2846 

or CSA B137.6; Schedule 40, 80 ASTM-F441 or CSA B137.6; 

or SDR Series ASTM-F442), ABS pipe materials (Schedule 40 

DWV ASTM-D2661 or CSA B181.1. The fittings, other than the 

TERMINATION should be equivalent to PVC-DWV fittings meeting 

ASTM D-2665 (Use CPVC fittings, ASTM F-438 for CPVC pipe and 

ABS fittings, ASTM D-2661/3311 for ABS pipe). If CPVC or ABS 

pipe and fittings are used, then proper cement must be used for 

all joints, including joining the pipe to Termination (PVC Material). 

If local codes do not allow the use of the PVC termination when 

a material other than PVC is used for venting, then an equivalent 

fitting of that material may be substituted if the screen in the PVC 

terminal is removed and inserted into the new fitting.

  canadIan InstallatIons:

Installation of this water heater must comply with the 

current edition can/csa b149.1 - natural Gas and propane 

Installation code which requires the vent system components 

be certified to ULC S636.

  This water heater has been design certified to be vented with 

PVC pipe certified and marked as complying with ULC S636. 

This water heater is supplied with a 2 inch termination elbow 

that is a special fitting that must be used with the appliance. Any 

outlet

 piping, fittings and glue used to vent this appliance that 

is not supplied by the manufacturer must comply with the ULC 

S636 requirements.

  PVC Materials should use ASTM D-2564 Grade Cement; CPVC 

Materials  should  use  ASTM  F-493  Grade  Cement  and  ABS 

Materials should use ASTM D-2235 Grade Cement.

  If the water heater is being installed as a replacement for an 

existing power vented heater in pre-existing venting, a thorough 

inspection of existing venting system must be performed prior 

to any installation work. Verify that correct material as detailed 

above has been used, and that the minimum or maximum vent 

lengths and terminal location as detailed in this manual have been 

met. Carefully inspect the entire venting system for any signs of 

cracks or fractures, particularly at  joints between elbows and 

other fittings and straight runs of vent pipe. Check system for signs 

of sagging or other stresses in joints as a result of misalignment 

of any components in the system. If any of these conditions are 

found, they must be corrected in accordance with the venting 

instructions  in  this  manual  before  completing  installation  and 

putting the water heater into service.

  note:

  For  water  heaters  in  locations  with  high  ambient 

temperatures above 100°F (38°C) it is recommended that CPVC 

or ABS pipe and fittings be used.

4. All vent (exhaust) pipes must be pitched a minimum of a 1/4” per 

foot back to the water heater to allow drainage of condensation.

InstallatIon of vent sYsteM

Before beginning installation of piping system thoroughly read the 

section of this manual VENT PIPE PREPARATION.
If  you  are  installing  your  system  so  that  it  vents  through  roof, 

please refer to section  titled INSTALLATION OF VERTICAL VENT 

SYSTEM.

vent terMInal InstallatIon, sIdewall

1.  Install the vent terminal by using the cover plate as a template 

to  mark  the  hole  for  the  vent  pipe  to  pass  through  the  wall.  

BEWARE OF CONCEALED WIRING AND PIPING INSIDE THE 

WALL.

2.  If the Vent Terminal is being installed on the outside of a finished 

wall, it may be easier to mark both the inside and outside wall.  

Align  the  holes  by  drilling  a  hole  through  the  center  of  the 

template from the inside through to the outside. The template 

can now be positioned on the outside wall using the drilled hole 

as a centering point for the template.

3.  A)  MASONRY SIDE WALLS
  Chisel an opening approximately one half inch (1.3 cm) larger 

than the marked circle.

  B)  WOODEN SIDE WALLS
  Drill a pilot  hole approximately one quarter inch (0.64 cm) outside 

of the marked circle. This pilot hole is used as a starting point 

for a saws-all or sabre saw blade. Cut around the marked circle 

staying approximately one quarter inch (0.64 cm) outside of the 

line. (This will allow the vent to easily slide through the opening. 

The resulting gap will be covered up by the Vent Terminal cover 

plate.) Repeat this step on inside wall if necessary.

Summary of Contents for she100

Page 1: ...TECHNICAL AND WARRANTY QUESTIONS SHOULD BE DIRECTED TO THE LOCAL DEALER FROM WHOM THE WATER HEATER WAS PURCHASED IF YOU ARE UNSUCCESSFUL CALL THE TECHNICAL SUPPORT PHONE NUMBER SHOWN ON THE WATER HEAT...

Page 2: ...Filling the Water Heater 20 Venting 20 Installation Requirements Commonwealth of Massachusetts 22 Commonwealth of Massachusetts 22 Installation of Carbon Monoxide Detectors 22 Approved Carbon Monoxide...

Page 3: ...birth defects or other reproductive harm and requires businesses to warn of potential exposure to such substances This product contains a chemical known to the State of California to cause cancer birt...

Page 4: ...ny electrical appliance connected to the hot water system If hydrogen is present there will probably be an unusual sound such as air escaping through the pipe as the water begins to flow There should...

Page 5: ...5 General safety information...

Page 6: ...h NFPA 54 Use joint compound or Teflon tape compatible with propane gas Fire and Explosion Hazard Turn off gas lines during installation Contact a qualified installer or service agency for installatio...

Page 7: ...stallation diagrams are also found in this manual These diagrams will serve to provide the installer with a reference It is essential that all venting water piping gas piping and wiring be installed a...

Page 8: ...rface Igniter I Junction Box J Gas Valve Assembly K Display Board L Top Plastic Enclosure Z T P Relief Valve AA Rating Plate BB Labels CC Drain Valve DD Vent Terminal EE Drain Pan FF Anode Rod GG Insu...

Page 9: ...W C 3 48kPa Minimum Supply Pressure for Natural Gas 3 50 87kPa Minimum Supply Pressure for Propane Gas 8 00 1 99kPa Minimum pressure must be maintained under both load and no load dynamic and static...

Page 10: ...supply See Power Supply on page 14 for requirements 8 Locate the water heater where an adequate supply of fresh air for combustion and ventilation can be obtained See Combustion Air and Ventilation on...

Page 11: ...r death Do not apply insulation to the top of the water heater as this will interfere with safe operation of the blower assembly Do not cover the outer door thermostat or temperature pressure relief v...

Page 12: ...do not take in to account the presence of louvers grilles or screens in the openings The required size of openings for combustion ventilation and dilution air shall be based on the net free area of e...

Page 13: ...nstalled in the enclosure When ducts are used they shall be of the same cross sectional area as the free area of the openings to which they connect The minimum dimension of rectangular air ducts shall...

Page 14: ...pply If the Hot and Neutral wires in the 120 VAC power supply are reversed the control system will declare a Fault condition and lock out heating operation will be disabled until the power supply is c...

Page 15: ...ines meeting the National Sanitation Foundation requirements are designed to operate with water flow pressures between 15 and 25 pounds per square inch 103 kPa and 173 kPa Flow pressures above 25 poun...

Page 16: ...overed under the limited warranty Thermal expansion can also cause intermittent temperature pressure relief valve operation water discharged from the valve due to excessive pressure build up This cond...

Page 17: ...locked or reduced in size under any circumstances Excessive length over 30 feet 9 14 m or use of more than four elbows can cause restriction and reduce the discharge capacity of the valve No valve or...

Page 18: ...systems use pressures that exceed 14 W C 1 2 PSI Gauge These systems must use field supplied regulators to lower the gas pressure to less than 14 W C 1 2 PSI Gauge Appliances require gas regulators t...

Page 19: ...utlet of the condensate drain does not create a slippery condition which could lead to personal injury CONDENSATION WARNING THIS WATER HEATER IS A CONDENSING UNIT AND REQUIRES A DRAIN TO BE LOCATED IN...

Page 20: ...ided in Figures 15 16A 16B and 17 Plan the vent system layout so that proper clearances are maintained from plumbing and wiring Vent pipes serving power vented appliances are classified by building co...

Page 21: ...and terminal location as detailed in this manual have been met Carefully inspect the entire venting system for any signs of cracks or fractures particularly at joints between elbows and other fitting...

Page 22: ...ent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size gas vent directly below Keep clear of all ob...

Page 23: ...to building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 12 inches 30 cm for appliances between 10 000 Btu hr 3 kW and 100 000 Btu hr 30kW 36 i...

Page 24: ...into building or combustion air inlet to any other appliance 6 inches 15 cm for appliances up to 10 000 Btu hr 3 kW 12 inches 30 cm for appliances between 10 000 Btu hr 3 kW and 100 000 Btu hr 30 kW...

Page 25: ...ENT PIPE READ THE VENT PIPE MANUFACTURER S INSTALLATION INSTRUCTIONS 1 After the points of termination have been determined use the cover plates as templates to mark the holes for the vent pipes to be...

Page 26: ...on must be no closer than 24 61cm The specifications are displayed in Figures 18 and 19 NOTE Exhaust vent terminal is installed using the same procedure Flat Roof Installation On flat roof installatio...

Page 27: ...may cause intermittent operation INSTALLATION PROCEDURE 1 ROOF TERMINATION see Figure 24 1 Determine best location for termination kit NOTE Roof termination is preferred since it is less susceptible t...

Page 28: ...nts shrubs or air conditioning equipment Termination kit positioned so it will not be affected by wind eddy that may allow recirculation of combustion products or airborne leaves or light snow Termina...

Page 29: ...nsion more than 60 1 5 m See Figure 21 Do not use field supplied couplings to extend pipes Airflow restriction will occur and the heater pressure switch may cause intermittent operation 7 Cement heate...

Page 30: ...distance is maintained The air intake screen can be removed for space heating at cold climate installation to prevent potential air intake freeze up If air intake screen is removed during winter to p...

Page 31: ...inches 15 2cm and above PRIMER It is recommended that Tetrahydrofuran THF be used to prepare the surfaces of pipe and fittings for solvent welding Do not use water rags gasoline or any other substitut...

Page 32: ...distance and make a second mark as the primer and cement will most likely destroy your first one Apply primer to the surface of the pipe and fitting socket with a natural bristle brush This process so...

Page 33: ...exhaust elbow and for obstructions in the exhaust venting and exhaust vent terminal Also verify that the vent length does not exceed the maximum allowed as shown in the Vent Section of this manual BLO...

Page 34: ...RORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION VERIFY PROPER OPERATION AFTER SERVICING Power Vent Wiring Schematic Figure 35 THIS WATER HEATER IS POLARITY SENSITVE BEFORE APPLYING ELECTRICITY TO THIS...

Page 35: ...INSTRUCTIONS 1 Set the thermostat to the lowest setting 2 Set the ON OFF switch on the control panel to the OFF position 3 Turn off all electrical power to the appliance if service is to be performed...

Page 36: ...supply to the water heater must be turned off and on again to reset the control system Contact your dealer or servicer if continued high limit switch operation occurs It is recommended that lower wate...

Page 37: ...orage tank Heating cycles and ignition are managed by the control system The ECO energy cut out Flame Sensor pressure switches and Temperature Probe is monitored by the control system The Combustion B...

Page 38: ...gniter is being energized The Igniter has been energized and the control system has sensed the required minimum igniter current The check mark icon is visual confirmation of minimum igniter current GA...

Page 39: ...the control system Note Cycling power will not reset the control system if the condition that caused the Fault has not been corrected Control System Menus From the Desktop screen pressing the Operatio...

Page 40: ...t and description of control system menus Use the Up and Down Buttons to view all control system menus from the Main Menu With Temperatures menu selected highlighted in black in the Main Menu screen p...

Page 41: ...rrent Operating State see Table 10 for a description of the various operational states ECO Contact Blocked Inlet PS Blocked Outlet PS Blower Prover PS displays the current state of the switch contacts...

Page 42: ...he control system water heater has been energized Burner On Time Total accumulated time the control system has been in the heating operating state burner run time Cycle Count Total accumulated count o...

Page 43: ...ew details for each Fault or Alert message stored Note fault history memory is cleared after 30 days 1 Blocked Air Intake A7 51 mins ago 2 Blocked Exhaust A8 54 mins ago 3 Low Gas Pressure A6 57 mins...

Page 44: ...Contact Information Yes Change Contact Name Change Contact Phone Current Contact Info 000 000 0000 Access Code UPDATE CANCEL Service Contact Information Using the UP and DOWN buttons select highlighte...

Page 45: ...a A concentration of sulfate in the supply water b Little or no dissolved oxygen in the water c A sulfate reducing bacteria which has accumulated within the water heater this harmless bacteria is non...

Page 46: ...d anode rod can extend the life of your water heater Inspection should be conducted by a qualified technician and at a minimum should be checked annually after the warranty period Artificially softene...

Page 47: ...t 4 Connect a hose to the drain valve and terminate it to an adequate drain 5 Ensure the drain hose is secured before and during the entire flushing procedure Flushing is performed with system water p...

Page 48: ...emperature Pressure Relief Valve on page 17 for instructions on replacement DISCHARGE PIPE TEMPERATURE PRESSURE RELIEF VALVE Figure 38 If the Temperature Pressure Relief Valve on the water heater weep...

Page 49: ...drain valve may be due to the valve being slightly opened F The drain valve may be leaking at the tank fitting G Leakage from recirculation plug or pipe connection H Leakage from the plug under the cl...

Page 50: ...rgized and will coast to a stop 13 Thecontrolsystemnowentersthestandbymodewhilecontinuing to monitor the internal storage tank water temperature and the state of other system devices If the tank tempe...

Page 51: ...em Igniter is energized for warm up period 24 V Gas Valve is energized gas flows to Main Burner Is flame sensed at the Main Burner control system monitors the flame sensor Control System Locks Out Dis...

Page 52: ...a Fault condition it will display a Fault message on the control system s LCD with an exclamation mark The control system will lock out and disable heating operation until the condition is corrected T...

Page 53: ...urface igniter is at ignition temperature causing delayed ignition which can cause a fire or explosion mark The water heater will continue to operate during an Alert condition but the water heater mus...

Page 54: ...CHANGE BACK ADVANCED Ignition Failure Fault occurred 2 mins ago The water heater has failed to ignite the burner Call a service professional Your Company Name Here press DOWN for more The control syst...

Page 55: ...e tube Combustion Blower is not running when energized Loose or open wiring to Combustion Blower CHANGE BACK ADVANCED Blower Prover Open Fault occurred 2 mins ago The blower prover switch remains open...

Page 56: ...56 Notes...

Page 57: ...57 Notes...

Page 58: ...58 Notes...

Page 59: ...e heater is connected to unless an effective method of controlling thermal expansion is also installed at the heater s and operational at all times The temperature and pressure relief valve installed...

Page 60: ...60 www statewaterheaters com 500 Tennessee Waltz Parkway Ashland City TN 37015 Tech Support 800 527 1953 Parts 800 433 2545 Copyright 2012 State Water Heaters All rights reserved...

Reviews: