3
INSTALLATION AND FUNCTION EXPLANATION
3.1
TECHNICAL DRAWING FOR INSTALLATION PROCEDURE AND INSTRUCTION
TECHNICAL DRAWING FOR INSTALLATION
PROCEDURE AND INSTRUCTION
1. Use a Phillips screwdriver to take off the screws as
shown 3 and plate 1.
2. Put plate 1 at your fixing place and use screws as
shown 2 to fix the plate 1.
3. Put the control box 4 on plate 1 and fix with screws
as shown 3.
4. Put the plug from pump to the part as shown 6.
5. Put plug 5 as shown to the correct power supply
socket.
6. Strictly follow the operation steps as indicated in this
manual.
3.2
WIRE CONNECTION
Wire connection has been finished before factory delivery as per request, if you need to re-connect the wires,
please pay attention as below:
3.2.1.
WIRE CONNECTION AND DESCRIPTION FOR 2HP AC220V SINGLE PHASE IN - SINGLE PHASE OUT
WIRE CONNECTION SKETCH
PROCEDURE AND INSTRUCTION
1. Disconnect power before opening the control panel.
2. Make sure no connection between PE, N, L1
terminals and U,V terminals.
3. Wire connection operated only when power disconnected.
4. Check if the input voltage from the power supply is
compliance with CLEVER-pool.
5. No voltage duration test.
6. Screw torque for terminal screws more than 1.7Nm.
7. Ground link must be connected before operation.
8. Must use the copper wires over 1.5mm² and O dia over 8mm.
9. Power supply connected only when the control
panel is connected.
DIMENSIONS
PARAMETER SHEET
ITEM/MODEL
CLEVER-POOL
Input power
Single-phase AC
Input voltage
230V
Input frequency
50/60Hz
Output power
1~230V
Pump type
Single-phase
Max. power
1500W
Max. current
12A
Mode option
Manual or Auto
Cooling
By air
Motor speed range
50Hz:1200~3000rpm
60Hz:1200~3600rpm