iQ Control Box
24 Document # 204143 REV 5 • www.stanleyaccess.com • 1.800.7.ACCESS
Cop
yr
ight 2019, S
tanley Ac
cess T
echnologies, LL
C. All rights r
es
er
ved. R
epr
oduction
in whole or in p
ar
t without the expr
ess wr
itt
en permission o
f S
tanley is pr
ohibit
ed.
10.18.2019
Attachment 4
Monitored Sensors Wiring Diagrams
(Sheet 2 of 14)
OHP1
DMS2
DMA2
DMA1
DMS1
SU100
SU100
*See NOTES 1 & 2
NOTES
:
1. Optional SU100 for two-way traffic.
2. If the optional SU100 for two-way traffic is needed, this additional SU100 requires adding
a 24VDC external power supply into TB4-1 and TB4-2 and removing the 15V power jumpers
from TB7 and TB4 (see Attachment 5 sheet 3).