Instruc
tion manual - English - EN
31
MNTCMPXT_1824_EN
7 Instructions for safe
operation
7.1 Safe operation
Before proceeding with the following
operations, make sure that the mains
voltage is correct.
7.1.1 Commissioning
Read the whole of this user’s handbook very carefully
before starting the installation.
STAHL strongly recommend to test the device
configuration and performance before putting it in
the final installation site. Use appropriate tools for the
purpose.
Test system operation for positive results before
closing the product and allowing the presence of a
dangerous atmosphere.
Make sure that all the devices are certified for the
application and for the environment in which they
will be installed.
To reduce the risk of ignition don’t open the device
when a potentially explosive atmosphere is present.
After commissioning the system keep this handbook
in a safe place, available for later consultation.
7.1.2 Safety rules
Given the considerable weight of the system, use an
appropriate transport and handling system.
Before starting any operation, make sure the power
supply is disconnected.
Before powering the system, install an overload
protection device in the electrical equipment for the
building.
Make sure that all precautions for personal safety
have been taken.
Installation of the electrical equipment must comply
with the local legislation in force.
The device must be installed only and exclusively by
qualified technical personnel.
7.1.3 Explosion prevention rules
Use appropriate tools for the area in which you are
working.
Always remember that the device must be connected
to an appropriate earth conductor.
Before doing any technical work or maintenance
on the device, make sure that potentially explosive
atmosphere is not present.
Before starting any operation, make sure the power
supply is disconnected.
Do not open any kind of cap if there is a possibility of
your being in a potentially explosive atmosphere.
Make all connections, installation and maintenance
work in a non-explosive atmosphere.
The connection compartment lid is the only one that
can be removed. Keep any other cap closed.
Summary of Contents for EC-940-DUA Series
Page 2: ......
Page 4: ......
Page 87: ......
Page 88: ...MNTCMPXT_1824_EN R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 90: ......
Page 173: ......
Page 174: ...MNTCMPXT_1824_IT R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 176: ......
Page 259: ......
Page 260: ...MNTCMPXT_1824_FR R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 262: ......
Page 345: ......
Page 346: ...MNTCMPXT_1824_DE R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 347: ...RU EC 940 PTZ A EC 940 DUA PTZ...
Page 348: ......
Page 353: ...RU 7 MNTCMPXT_1824_RU 1 1 1 INFO 2 3 J1 6 5 19 1...
Page 354: ...RU 8 MNTCMPXT_1824_RU 40 C 60 C IEC EN60079 14 4 4 2 10...
Page 357: ...RU 11 MNTCMPXT_1824_RU 5 5 1 15A max 3mm 5 2...
Page 358: ...RU 12 MNTCMPXT_1824_RU 5 3 1 PTZ 1 2 1 1 2 2 IP 1 PTZ 1 2 1 1 2 2 1 CD 1 PTZ 1 2 1 3 6 2 2 5 4...
Page 363: ...RU 17 MNTCMPXT_1824_RU 6 3 15A max 3mm 80 C 10 C 3 4 NPT 01 02 03 02 01 03 12...
Page 376: ...RU 30 MNTCMPXT_1824_RU 6 21 STAHL 46 47 30mm 48 49...
Page 377: ...RU 31 MNTCMPXT_1824_RU 7 7 1 7 1 1 STAHL 7 1 2 7 1 3...
Page 378: ...RU 32 MNTCMPXT_1824_RU 8 De Ice 0 C 60 120 8 1...
Page 426: ...RU 80 MNTCMPXT_1824_RU 15 336 336 232 232 N 4 M10 N 4 M10 138 138 398 398 128 EC 940 PTZ A...
Page 427: ...RU 81 MNTCMPXT_1824_RU 453 453 232 232 N 4 M10 N 4 M10 138 138 398 398 129 EC 940 DUA...
Page 431: ......
Page 432: ...MNTCMPXT_1824_RU R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln...
Page 434: ......
Page 517: ......
Page 518: ...MNTCMPXT_1824_PT R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 519: ...KO EC 940 PTZ A EC 940 DUA PTZ...
Page 520: ......
Page 525: ...KO 7 MNTCMPXT_1824_KO 1 1 1 INFO 2 3 J1 6 5 19 1...
Page 526: ...KO 8 MNTCMPXT_1824_KO 40 C 60 C 40 F 140 F IEC EN60079 14 4 4 2 10 A UPS...
Page 529: ...KO 11 MNTCMPXT_1824_KO 5 5 1 15A 3mm 0 1 5 2...
Page 530: ...KO 12 MNTCMPXT_1824_KO 5 3 1 PTZ 1 2 1 1 2 2 IP 1 PTZ 1 2 1 1 2 2 1 CD 1 PTZ 1 2 1 3 6 2 2 5 4...
Page 535: ...KO 17 MNTCMPXT_1824_KO 6 3 15A 3mm 0 1 80 10 C 3 4 NPT 01 02 03 02 01 03 12...
Page 548: ...KO 30 MNTCMPXT_1824_KO 6 21 OR OR STAHL O 46 OR 47 30mm 48 49...
Page 549: ...KO 31 MNTCMPXT_1824_KO 7 7 1 7 1 1 STAHL 7 1 2 7 1 3...
Page 550: ...KO 32 MNTCMPXT_1824_KO 8 De Ice 0 C 60 120 8 1...
Page 579: ...KO 61 MNTCMPXT_1824_KO PC 117 118 9 7 2 1 WAN Setting IP IP 192 168 0 101 30 192 168 0 101 119...
Page 598: ...KO 80 MNTCMPXT_1824_KO 15 336 336 232 232 N 4 M10 N 4 M10 138 138 398 398 128 EC 940 PTZ A...
Page 599: ...KO 81 MNTCMPXT_1824_KO 453 453 232 232 N 4 M10 N 4 M10 138 138 398 398 129 EC 940 DUA...
Page 603: ......
Page 604: ...MNTCMPXT_1824_KO R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...
Page 605: ......
Page 606: ...MNTCMPXT_1824 MNTCMPXT_1824 R Stahl HMI Systems GmbH Adolf Grimme Allee 8 50829 K ln Germany...