© 2022 Staheli West
56
Common Operating Times
In dry climates, DewPoint operators normally start baling in the late evening and bale through the night,
adjusting steam for the changing dew conditions. If necessary, the operator can bale for 24 hours straight, as
long as conditions don’t get too wet or too hot, causing internal bale temperatures to exceed 135° F.
Dry Climates
Wetter Climates
In
wet climates, DewPoint operators normally start baling in the morning as soon as the dew burns off and the
hay is dry enough to start baling. Operators often bale through the rest of the day, as long as the internal bale
temperatures don’t exceed 135° F. They often bale into the evening until the windrows become too saturated
with dew.
1
2
3
4
5
6
7
8
9 10 11 12 1
2
3
4
5
6
7
8
9 10 11 12
AM
PM
Often too hot
1
2
3
4
5
6
7
8
9 10 11 12 1
2
3
4
5
6
7
8
9 10 11 12
AM
PM
Not enough dew / moisture / often too hot
1
2
3
4
5
6
7
8
9 10 11 12 1
2
3
4
5
6
7
8
9 10 11 12
AM
PM
Often too wet
1
2
3
4
5
6
7
8
9 10 11 12 1
2
3
4
5
6
7
8
9 10 11 12
AM
PM
Often too wet
Not enough dew / moisture