© 2022 Staheli West
49
Start DewPoint
1
3
5
2
4
6
Turn on the machine by flipping the red rocker
switch.
Press Start All.
Press Confirm Start.
The DewPoint ensures safeties are in place and starts
the burner fan.
A 30 second purge occurs before the burner ignites.
Follow the on screen instructions and then press
Continue.
The generator will start.
The boiler will begin to fill with water. (8-10 min)
*Tip: Top off the supply water tanks after filling boiler.
The burner ignites and begins heating boiler water
(10-20 min). Proceed to Burner Tune (Should be
tuned once a year or anytime it blows black smoke).