© 2022 Staheli West
41
1
3
5
2
4
Ensure that all relays are securely plugged in and latch
is closed.
Make sure all circuit breakers are turned “ON”.
Make sure the toggle switch on the bottom of the PLC
is set to “RUN”.
Ensure that all relays are securely plugged in and latch
is closed.
Make sure the “Run/Test” switch on the Honeywell
Burner Controller is in the “Run” position.
Electrical Panel Inspection