
© 2021 Staheli West
177
50 Hour Maintenance Checklist
EVERY 50 HOURS
STEP(S)
Clean inside the burner blast tube area
1
Clean electrodes and fuel nozzles with compressed air
2
Clean flame detector lens
3
Check blowdown system for blockages
4
Inspect front and rear of boiler by looking for any potential hot spots on the boiler doors
5
Purge steam through top front pigtail valves to clear the steam pressure sensor paths
6-7
Grease PTO anti-rotating shields
8
Grease PTO bearings
9
Grease axles
9
Inspect baler hardware
10-11
1st 50 HOUR MAINTENANCE
Replace burner fuel filter (Napa 4006) (See 250 hour maintenance step 1)
Summary of Contents for DewPoint 331
Page 213: ... 2021 Staheli West 204 Notes ...
Page 214: ... 2021 Staheli West 205 Notes ...
Page 215: ... 2021 Staheli West 206 Notes ...