flexitrax™ flexiprobe™ Operation Manual
7 Projects and Surveys
240
1. In the
Project
screen, press the
Create survey
button.
2. You must specify the following details:
Name:
The survey name defaults to the current date and time, but you can rename the survey here
as required. You can also rename the survey later; see
section 7.3.5
Select the
Continue
menu item.
The survey format and survey header data will automatically carry over from existing surveys in the
project.
7.3.4
Sort surveys by name or date
You can sort surveys by name or date created. Follow these steps:
1. In the home screen, press the
Projects button
2. In the
Projects
screen, use the
arrow keys to select the project containing the survey you
want.
3. Press the Open button.
4. In the
Project
screen, press the Sort by name or Sort by date buttons, as required. Press the
buttons again to sort in reverse order.
To restore surveys sorted by ID, simply close and reopen the
Project
screen.