background image

??

0190572R2 Page 1 of 6

Assembly Instructions

37133

3D2GO

 Printer Cart

Information

Specs

800-235-1262

http://www.spectrumfurniture.com/en/products/3d2go-printer-cart

i

Important

Before using this product:

•  Read this manual

•  Comply with all safety and operating instructions

•  Ensure all parts and correct quantities are included

Any parts damaged during shipment must be reported 

within 5 days of receipt.  To report information regarding 

missing parts or damage, to purchase parts or acces-

sories, or if you have any questions, please contact us.

Thank you for purchasing Spectrum products!

Spectrum Industries, Inc

925 First Avenue, Chippewa Falls, WI 54729 USA

800 235 1262

715 723 6750

www.spectrumfurniture.com

Summary of Contents for 3D2GO

Page 1: ...rating instructions Ensure all parts and correct quantities are included Any parts damaged during shipment must be reported within 5 days of receipt To report information regarding missing parts or damage to purchase parts or acces sories or if you have any questions please contact us Thank you for purchasing Spectrum products Spectrum Industries Inc 925 First Avenue Chippewa Falls WI 54729 USA 80...

Page 2: ...necessary please contact Spectrum Industries for assistance Electrical Safety Keep the power switches in the OFF position before plugging or unplugging from the wall outlet Turn OFF the devices before plugging them in Ensure total device equipment load does not exceed 12 amps Do not plug the power cord into an extension cord Inspect the power cords for damage before each use Do not use power cords...

Page 3: ... 4 20 x 5 8 PHMS 3 10 x 3 4 PHSM Clip 8 IEC Power Cord P o w e r S w i t c h 2 10 x 3 4 PHSM Cover 1 2 3 1 2 3 W o r k s u r f a c e Assembly If you have the optional Locking Cabinet follow the instructions to install at this point OR Rear bracket Front bracket Leg Leg ...

Page 4: ...1 4 20 x 5 8 PHMS 7 2 Cord Wrap Steel Panel installed horizontally as shelf Steel Panel installed vertically as modesty panel Allows use as desk 4 1 4 20 x 2 1 2 PHMS 8 Glide OR Install any optional Upper spool or bin racks before installing the panel into the vertical position Rear of cart ...

Page 5: ... Locking Cabinet Unit weight 10 lb 4 5 kg Shipping weight 11 25 lb 5 1 kg Note Flip up shelf and handle are interchangeable and can be mounted on either side Upper Spool Rack 37138 Includes uprights and one spool rack Provides consistent filament feed Adjustable height 25 W 63 5 cm 21 lb 9 5 kg max capacity Unit weight 6 lb 2 7 kg Shipping weight 7 lb 3 2 kg Upper Bin Rack 37139 Includes uprights ...

Page 6: ...TRUM S LIABILITY WHETHER UNDER CONTRACT OR WARRANTY IN TORT OR OTHERWISE EXCEED THE PURCHASE PRICE RECEIVED BY SPECTRUM FOR THE PRODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONTRACT WARRANTY TORT INCLUDING NEGLIGENCE AND STRICT LIABILITY OR OTHER THEORIES OF LAW WITH RESPECT TO PRODUCTS SOLD OR SE...

Reviews: