
SpectraLink Corporation
Installation, Configuration, and Administration
NetLink Telephony Gateway
Part Number: 72-0065-02-R.doc
Page 22
6.
Pre-Installation Verification
6.1
Verify Pre-Installation Requirements
Check the site to be sure pre-installation work has been completed correctly. This
includes:
•
Location chosen for the NetLink Telephony Gateway is adequate and power
is available.
•
APs are interoperable with SVP and coverage is adequate.
•
Telephone lines for the wireless devices are installed and properly terminated.
•
When installing a TGA116, the grounding terminal in the rear panel of each
unit must be electrically connected to earth ground. Consult NEC and local
codes for instructions on making the connection to the ground.
•
Dedicated line is available for remote access to diagnostic modem.
•
Telephone system administrator is on-site to program the existing telephone
system.
6.2
Check Components
The following items should be at the installation site.
•
NetLink Telephony Gateway
: Depending on the size of your system there
may be four or more NetLink Telephony Gateways which will be linked
together to support additional users.
•
AC Adapter
: Supplies power to the NetLink Telephony Gateway.
Use only the provided Class II AC Adapter with output 24VDC, 1A.
•
Screws
: Four, ¾ inch, #8 panhead screws for each NetLink Telephony
Gateway to be wall mounted.
•
Star Washers
: When installing multiple NetLink Telephony Gateways, two
per NetLink Telephony Gateway, to provide static protection.
•
ESD Bonding Straps
: When installing multiple NetLink Telephony
Gateways, one per NetLink Telephony Gateway, to provide static protection.
•
IPC Cable
: Each NetLink Telephony Gateway is shipped with one IPC
cable to carry signals between NetLink Telephony Gateways. It is used only
when four or fewer NetLink Telephony Gateways are linked together and no
NetLink SVP Server is installed.
You MUST use the IPC cable provided by SpectraLink when connecting
four or fewer NetLink Telephony Gateways without a NetLink SVP
Server.