SpectraLink Corporation
Installation—NetLink Telephony Gateway
NetLink SVP Server
Part Number: 72-0065-01-G.doc
Page 24
7. Install NetLink Telephony Gateway
Mount NetLink Telephony Gateway to wall
The NetLink Telephony Gateways can be mounted either horizontally or vertically. 19
inch rack mount adapters are available.
To Mount
Gateways…
Connector A is…
Mount the Units….
Clearance Between Gateways
Horizontally
To the right side of
the NetLink
Telephony
Gateway, with
labels in correct
position.
On top of one
another
Leave a little more than ¼ inch
between adjacent units, allowing
easy removal of units via the
keyhole openings on the rear panel.
Do not leave more than ½ inch
spacing or the ESD bonding strap
will not fit correctly.
To set the desired unit spacing,
leave (0.9” + desired gap) between
adjacent mounting holes.
Vertically
At the top of the
NetLink Telephony
Gateway
Side by side
Adjacent units should be physically
touching
To mount the NetLink Telephony Gateway:
1. Using a 1/8 inch drill bit, drill four pilot holes, on 1.84 by 12.1 inch centers
(approximately equivalent to 1-
13/16 inch by
12
-1/8
inch).
2. If installing only one NetLink Telephony Gateway, insert the #8 x 3/4 inch screws
in the pilot holes and tighten, leaving a 1/8 to 1/4 inch gap from the wall.
3. If installing more than one NetLink Telephony Gateway, the ESD bonding
strap(s) must be installed between adjacent gateways:
3.1 Remove the screws from the bottom (vertical mount) or left (horizontal
mount) of adjacent units.
3.2 Place the ESD strap over the pilot holes that span two units and hold it
against the plywood backboard.
3.3 Place the star washer on top of the ESD strap.
3.4 Insert the #8 x ¾ screw and tighten to leave 1/8 to 1/4 inch gap from the
wall.
3.5 Repeat for all ESD straps.
4. Position the NetLink Telephony Gateway with Connector A to the right
(horizontal) or bottom (vertical). Slide the NetLink Telephony Gateway over the
screws until the unit drops into place in the keyhole opening.
5. Tighten screws fully.