![Spectracom GSG-5 series User Manual With Scpi Manual Download Page 32](http://html1.mh-extra.com/html/spectracom/gsg-5-series/gsg-5-series_user-manual-with-scpi-manual_1343630032.webp)
1.
After making sure that the power cord has been unplugged, carefully turn the unit upside
down.
2.
Temporarily remove the two
rear feet
by loosening their screws.
3.
Remove the four
housing screws
and plugs (if present) at the side panels; discard them.
4.
Grip the front panel with one hand, while pushing at the rear with the other hand. Pull
the unit out of its housing.
5.
Remove the four
bottom feet
from the housing, as shown in the illustration below:
Use a screwdriver or a pair of pliers to remove the springs holding each foot, then push
out the foot.
Figure 2-3:
Preparing the GSG unit for rack mounting
6.
Gently push the unit into its housing again.
7.
Re-assemble the two
rear feet
.
8.
Install the
ears
that came with the
rack-mount kit
. Use the
rack-mount kit
M5
housing
screws
.
Figure 2-4:
Part identification: ears
16
CHAPTER
2
•
User Manual GSG-5/6 Series
Rev.
26
2.3 Mechanical Installation
Summary of Contents for GSG-5 series
Page 2: ......
Page 4: ...Blank page II User Manual GSG 5 6 Series...
Page 116: ...BLANK PAGE 3 6 Options Menu 100 CHAPTER 3 User Manual GSG 5 6 Series Rev 26...
Page 182: ...BLANK PAGE 4 9 Studioview Tasks 166 CHAPTER 4 User Manual GSG 5 6 Series Rev 26...
Page 368: ...BLANK PAGE 6 7 Revision History SCPI Guide 352 CHAPTER 6 User Manual GSG 5 6 Series Rev 26...