
Chapter 2 — Initial Configuration
Before You Begin
September 2017
User Guide
—
Spectra Verde Array
38
B
EFORE
Y
OU
B
EGIN
Make
sure
the
array
is
installed
in
accordance
with
the
.
C
ONNECT
E
THERNET
C
ABLES
Before
proceeding
with
the
below
sections,
you
must
connect
Ethernet
cables
to
the
management
and
data
ports
on
the
Verde
master
node
rear
panel.
See
for
the
location
of
the
Ethernet
ports
on
the
rear
of
the
array.
P
OWER
O
N
THE
A
RRAY
Use
the
instructions
in
this
section
to
power
on
a
Verde
array.
During
the
power
‐
on
sequence,
the
Verde
array
initializes
all
of
its
installed
components
and
starts
the
Verde
web
server.
Verde Master Nodes and Verde Enterprise Expansion Nodes
To
power
on
a
Verde
array,
remove
the
front
bezel,
and
then
gently
press
the
power
button
on
the
front
panel.
If
your
configuration
includes
both
a
Verde
master
node
and
one
or
more
enterprise
expansion
nodes,
power
on
all
arrays
together.
The
power
LED
illuminates
indicating
that
power
is
on.
See
for
more
information
.
Figure 11
Press the power button.
Power
Power LED
button