
INSTRUCTIONS FOR MODELS
92-SB-2534-36-01
For additional assistance or service please contact:
SPEAKMAN
®
800-537-2107
www.speakman.com
SB-2534
SB-2536
HELPFUL TOOLS & SUPPLIES:
TOOLS AND SUPPLIES
Pencil
Phillips
Screwdriver
Drill
Drill Bit
5/16”
6mm
Hex
Key Wrench
(Included)
2.5mm Hex
Key Wrench
(Included)
Level
Adjustable
Wrench
Pipe
Wrench
Thread Seal
Tape
Measuring
Tape
Safety
Glasses
Warranty information can be found at:
www.speakman.com
WARRANTY
MAINTENANCE
SAFETY TIPS
IMPORTANT
• Be sure to read instructions thoroughly before
beginning installation.
• Cover the installation area(s) as deemed
necessary to prevent any loss of parts.
Your new Speakman Product is designed for years of
trouble-free performance. Keep it looking new by
cleaning it periodically with a soft cloth. The use of harsh
chemicals and abrasives on any of the Speakman custom
finish products may damage the finish and void the
product warranty. Please be sure to only use approved
cleaners. Please contact Speakman for any clarification
of acceptable cleaners.
IMPORTANT
• Do not over-tighten any connections or damage
may occur.
• Shut off the water supply before beginning
installation.
• This installation manual covers several models.
While your models may look different, it will install
in the same manner.
• This Faucet has an operating range of 20-80 psi.
•
CAUTION:
Risk of personal injury. Do not use
the bath filler as a grab bar or support bar when
entering or exiting the bath. The bath filler is not
designed to support weight.
• Observe all local plumbing and building codes.
• Use appropriate drill bits for wood and other
materials.
• Installer supplied copper tubing (if used) must be
5/8
”
OD (1/2
”
Nominal).
1
FINISHED
FLOOR
SUBFLOOR
CAVITY
1-5/8"
(41mm) MIN
4-5/8"
(118mm) MAX
WOOD SUPPORT
FINISHED
WALL
6"
(152mm)
MIN
FINISHED
FLOOR
2-1/2"
(64mm)
MIN
BATH
TUB
BASE
CENTERLINE
NOTICE:
Adequate floor support is required. The wood support must be a minimum
of
1.5” ( 38mm)
thick
by
5.5” (140mm)
wide.
2x6 lumber
is adequate for this application.
IMPORTANT!
Lumber required for Wood Support shall be at least 2 x 6 dimensional lumber.
• Plan out the bath filler placement based on the dimensions in the "ROUGH-IN DIAGRAM".
• Cut a hole in the subfloor large enough to install the wood support between two floor joists.
• Secure a wood support 1-5/8
”
(41mm) - 4-5/8
”
(118mm) below the height of the finished floor.
NOTE:
Concrete can be used as the floor support.
SITE PREPARATION
FLOOR JOIST
2
TOP VIEW
BATH
TUB
COLD
PENCIL
WALL
HOT
NOTE:
Verify correct Spout orientation before securing the Base to the wooden support.
• Orient the Base with the cold supply side in the
direction shown.
• If possible, dry fit the Faucet to the Base using
the Screws and Washers. Orient the Spout to the
inside of the bath tub.
• If your Faucet is not available at this time, make
sure the Base is positioned so the Faucet will
properly run water into the bath tub.
• Mark the mounting hole locations on the
wooden support.
• Mark the orientation of the Base on the wooden
support for reference.
NOTE:
The Base has embossed letters
"C"
and
"H"
to indicate cold and hot supply sides,
respectively. Ensure that the Base is oriented with
"C"
being towards the "TUB" side and
"H"
being
towards the "WALL" side.
SPOUT ORIENTATION
3
NOTE:
Floor structure shown is for
REFERENCE ONLY
.
Ensure your installation is properly oriented to the Bath Tub.
5/16”
6mm
• If attached, remove the Faucet from the Base.
• Drill holes through the wood support with a
5/16” drill bit (not provided) using the marked
locations as the center point.
• If using concrete as the floor support, use
appropriate mounting hardware (not provided).
• Realign the Base to the position as marked.
• Secure the Base to the support with the Screws,
Nuts, Split-Washers and Washers provided.
• Verify the Base is level and tighten the
Screws/Nuts.
FLOOR
JOIST
WOOD
WASHER
SPLIT-WASHER
NUT
SUPPORT
5/16"
MOUNTING
HOLE
BASE
SCREW
BASE INSTALLATION
4
NOTE:
The Base has embossed letters
"C"
and
"H"
to indicate cold and hot supply sides, respectively.
• Apply sealant tape on the ½
”
NPT hot and cold
supply pipes and thread into the Base.
• Turn ON the water supply and check for leaks.
• Turn OFF the water supply.
• Secure the Protective Cover onto the Base with
the Screws provided.
GUARD
SCREW
HOT SUPPLY
BASE
COLD SUPPLY
SUPPLY CONNECTIONS
5
• Finish the floor leaving a 4-5/8" (117mm) by 4-5/8" (117mm) square hole for the Protective Cover.
• Cut the Protective Cover so it is flush with the finished flooring.
FINISHED FLOOR INSTALLATION
PROTECTIVE
COVER
FINISHED FLOOR
FIT THE FINISHED FLOOR
BETWEEN THE
MIN AND MAX LINES.
[117mm]
4-5/8"
[117mm]
4-5/8"