INSTRUCTIONS FOR MODELS
92-SE-4330-01
For additional assistance or service please contact:
SPEAKMAN
®
Company
400 Anchor Mill Road
New Castle, DE 19720
800-537-2107
www.speakman.com
SE-4330
GRAVITYFLO
™
Portable Eyewash
with Heated Jacket
HELPFUL TOOLS & SUPPLIES:
TOOLS AND SUPPLIES
Flat Tip
Screwdriver
Adjustable
Wrench
Socket
Wrench
Phillips
Screwdriver
Pencil
Level
Drill
Drill Bit
Measuring
Tape
Safety
Glasses
Slip Joint
Wrench
3 Year Limited Warranty
1 Year on the Control Unit/pads/jacket
Additional warranty information can be found at:
www.speakman.com
WARRANTY
Be sure to wear eye protection.
SAFETY TIPS
IMPORTANT
Product is designed to be used indoors
Product is designed to be used indoors
and outdoors.
and outdoors.
When mounted in outdoor conditions, product must be
When mounted in outdoor conditions, product must be
in a covered area and not directly exposed to outdoor
in a covered area and not directly exposed to outdoor
elements such as rain and snow.
elements such as rain and snow.
ANSI Z358.1 requires that all self-contained eyewash
shall be visually inspected weekly, unless the product
is placed in environments with extreme conditions that
may affect the form, fit, or function of the unit
(temperature, dirt, etc.). If this is the case, then the
inspection should be conducted more often as the end
user deems necessary. Speakman Company furnishes
a testing record tag (91-0635) with each unit. On this
tag, the date of inspection and the inspectors’ initials
should be noted. ANSI Z358.1 specifies that the
height of the spray heads is to be between 33” - 45”
from the floor. The SE-4330 unit weighs approximately
185 lbs filled. Ensure the mounting surface (wall, etc.)
and mounting hardware can safely hold a minimum
vertical load of 300 lbs. Be sure to read instructions
thoroughly before beginning installation. Do not
overtighten any connections or damage may occur.
The unit should be full at all times, to achieve the
minimum 15 minute run time as stated by ANSI, in
case of an emergency. Refill the tank to a full level
after each activation. Before refilling tank dry and
clean outside of spray heads, and inside of pull strap
to remove debris, and to assure proper sealing.
MAINTENANCE
Always disconnect power while servicing the unit and
Always disconnect power while servicing the unit and
allow the unit to cool down before filling with water.
allow the unit to cool down before filling with water.
Occasional cleaning and disinfection is recommended.
To clean the inside of the unit, add 1/2 cup (4 fluid
oz.) of Clorox (liquid bleach) to a full tank of potable
water. Allow the mixture to penetrate for 15 minutes.
Drain tank, and rinse thoroughly several times with
potable water. Take care to not overtighten drain cap
as damage may occur. For further information about
Clorox, call toll-free at 1-800-292-2200. Follow
refilling instructions in this manual and place the tank
back in service. Should any repair part be required,
use only genuine SPEAKMAN parts for repair or
replacement. See available replacement parts in this
document, to order parts call 1-800-537-2107.
As part routine inspection, the unit shall be checked for
adequate water level. (Within 5" of the top cap)
WARNING: This units maintains the water
temperature within the tepid range of 60-90 F.
Depending on the water temperature within the tank
and the ambient conditions, it may take up to
24 hours for the water temperature to reach the
tepid range during initial start-up. If noted during
inspection the water temperature is outside that
range, the product should be taken out of service
and the condition troubleshooted.
1
Select a suitable location for the SE-4330.
When mounted in outdoor conditions, product
When mounted in outdoor conditions, product
must be
must be in a covered area and not directly
in a covered area and not directly
exposed to outdoor elements such as rain and
exposed to outdoor elements such as rain and
snow.
snow. After confirming the Spray Head height,
refer to the rough-in diagram for Wall Bracket
height measurements to determine mounting hole
locations for the bracket. Making sure the
bracket is level, mark and drill holes in the
mounting structure.
Note:
Mounting hardware not included. Ensure
the mounting surface (wall, etc.) and mounting
hardware can safely hold a minimum vertical
load of 300 lbs.
2
Mount the Wall Bracket using appropriate
hardware, making sure to torque to
manufacturer’s specifications, if applicable.
Note:
Mounting hardware not included. Ensure
the mounting surface (wall, etc.) and mounting
hardware can safely hold a minimum vertical
load of 300 lbs.
3
Install empty Tank to Wall Bracket by first inserting “hook” on the top of the bracket through the
Jacket Slot located at the upper rear of jacket and into the handle of the Tank (1). Lower the Tank
inserting the lower bracket section through the Jacket Slot and under the Tank. Push the Tank
towards the bracket until the Wall Bracket snaps into the recess at the bottom of the Tank (2).
*CROSS SECTION VIEW
HANDLE
WALL
BRACKET
DRAIN
4
CERTIFIED TO ANSI/ISEA Z358.1
Remove the Front Access Panel (1) from
the Jacket (2).
5
Use a flat head screw driver to ensure that the Bracket (1) and the tank's Drain Hole (2) align. The
Front Access Panel will need to be removed for this process.
* VIEW FROM
UNDER THE TANK
6
Insert Drain Fitting (1) through openings in the Tank and Wall Bracket. From below, reaching
between the Jacket and the Tank, install Drain Washer (2) and Drain Nut (3) to threaded portion
of Drain. Wrench tighten. Take care to not over tighten or damage may occur. Retrieve Drain
Hose (4) from parts accessory bag. Slide threaded Drain Hose (4) through hole in Jacket bottom
and secure to Drain Fitting (1). Hand tighten only.
* VIEW FROM UNDER THE TANK