
Form 43343110
May 2021
-41-
15.2)
AIR FOR COMBUSTION
–
THROUGH CEILING
If the heater is installed less than 2 ft. from the ceiling, a flexible transition section must be used to allow for
expansion/contraction of straight tube heaters. Install the fresh air intake assembly (supplied in accessory Kit no.
44129500) shown below.
In colder climates, where necessary, insulate the outside combustion air duct. Avoid locating the outside
combustion air duct directly above the control box. Provide a capped cleanout T as necessary.
The Cold Air Stopper (supplied as accessory) is installed into the combustion air inlet duct and is used to prevent
cold air from entering the control unit during periods where the burner and draft inducer are off.
Flexible Air Intake Hose: Insure that the Air Intake Hose connection is not too tight between the control box and
the Air Intake. The air intake hose can become disconnected as the heater expands and contracts during
operation.
Summary of Contents for PCA-SS 100
Page 13: ...Form 43343110 12 May 2021 7 1 DIMENSIONS STRAIGHT CONFIGURATION 48 HANGING CENTERS...
Page 14: ...Form 43343110 May 2021 13 7 2 HEATER ASSEMBLY JOINING OF TUBE SECTIONS...
Page 21: ...Form 43343110 20 May 2021...
Page 48: ...Form 43343110 May 2021 47 19 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5...
Page 49: ...Form 43343110 48 May 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Page 50: ...Form 43343110 May 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED...
Page 51: ...Form 43343110 50 May 2021 19 1 TROUBLESHOOTING GUIDE TWO STAGE N7 L7...
Page 52: ...Form 43343110 May 2021 51 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...
Page 53: ...Form 43343110 52 May 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED...