Instruction Sheet:
Cut Out Climbing Wall 152018
Store these instructions along with the enclosed maintenance checklist
in a safe place. You may also access them on our website.
Take time to familiarize yourself with the use and maintenance of this equipment before using. Please file
this Instruction Sheet in an accessible location. The Instruction Sheet must be read and familiar to anyone
who is using Southpaw Enterprises Equipment.
IMPORTANT: Please check equipment immediately for any damage that may have resulted during shipping.
If any damage has occurred, please contact Southpaw Enterprises, Inc. immediately.
MATERIALS LIST:
3 - Panels w/Cut Outs
12 - Connector Screws
4 - Side Rails
1 - 7/32 Hex Key
2 - Connector Boards
1 - 4 mm Hex Key
8 - 3/8” Button Head Cap Screws
1 - Instruction Sheet
8 - 3/8” Flat Washers
1 - Maintenance Checklist
WORKING LOAD:
300 lbs.
ASSEMBLY:
•
Unpack and identify all of the parts. Read the instructions completely before starting as-
sembly. It might be helpful to lay out all of the parts in their proper position before starting
actual assembly. Refer to illustrations at right.
•
Figure 1 shows the relationship of the top side rail and the top panel. All three panels are
identical, but notice the arrow on each panel. The arrows should point up towards the hook
end of the top side rail.
•
Insert a panel into the groove of the top side rail as shown in figure 1. Align the holes in
the panel and side rail and insert a connector screw. Tighten the screw using the 4 mm
hex key provided. Tighten the screw securely. Insert a second screw as shown in figure 2
and tighten.
•
Attach on of the connector boards to the bottom of the upper side rail with two of the 3/8”
button head cap screws with a flat washer on each screw. Do not tighten the screws at this
time. Put the lower half of the side rail in position (make sure that the grooves line up) and
use two more cap screws and washers to fasten the rail to the connector board as shown
in figure 3. Tighten all four screws securely.
•
Insert the second panel into the groove below the first one and use two connector screws
to secure it to the side rail as shown in figure 4.
•
Insert the third panel into the groove below the second one and use two connector screws
to secure it to the side rail as shown in figure 5.
•
Attach the side rails and connector board on the opposite side in the same manner.
MAINTENANCE CHECKLIST:
All of the following wear points should be checked on a monthly basis and recorded on the
maintenance checklist enclosed.
•
Check wood for splinters. If splinters are found, sand smooth and refinish with lacquer.
•
Check for loose bolts. If loose bolts are found, tighten them securely.
STORAGE PROCEDURES:
Store where not accessible by clients without proper supervision.
CLEANING INSTRUCTIONS:
Check with your infectious disease department before using these procedures.
•
Check for client allergies first.
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5