D-EJ775
7
knob (GPRO)
2
eight screws (B2)
1
Open battery case lid.
4
cabinet (upper) sub assy
Note : On installation of cabinet (upper) sub assy,
adjust the position of two switch (S803)
and knobs (GPRO).
3
claw
S803
3
claw
3
claw
3-3.
PLATE (SPRING)
3-4.
CABINET (UPPER) SUB ASSY
4
plate (spring)
3
spring (full open. A)
2
1
two screws
3
spring (full open. B)