DSC-HX10/HX10V_L2
3-1E
3. ASSEMBLY
Assembly-1:
Attaching Method of LCD Cushion (330), LCD
Window (330).
Attach the LCD Cushion (330).
Peel off the released paper.
Set the LCD to the Cabinet (Rear) Assy.
Align shape of corner.
LCD
Released Paper
LCD
Cushion
(330)
LCD
Cabinet (Rear) Assy
Install the LCD Window (330).
Remove the LCD.
Blow the air before attaching.
Be sure to keep away from dust.
LCD
Cabinet (rear) assy
Cabinet (rear) assy
LCD Window (330)
Assembly-2:
Precaution During of attachment Shield Ring.
Shield Ring
Glossy surface
Cabinet Front
Precaution During of attachment
Shield Ring.
Assembly-3:
Precaution During of Main Frame installation.
Main Frame
Between the Front Cabinet
and the BT Frame.
Inside the Front Cabinet
and the BT Frame.
Assembly-4:
Precaution During of Rotary Plate installation.
Marking
Rotary plate
Cabinet (Upper) Assy
Non Click
After installation, turn the dial to confirm that there is
no click in the area shown in the figure below.
Adjust the position
(Adjust the position)
RL-127 Board
Assembly-5:
Precaution During of flexible board of the strobe
unit installation.
Boss
Lever
Flexible board of
the strobe unit
Route the Flexible board of the strobe unit as shown in the figure.
Set the Lever as shown in the figure.
Flexible board of
the strobe unit
Lever