D-EJ855
8
3-3.
CABINET (UPPER) SUB ASSY
3-4.
MAIN BOARD, OPTICAL PICK-UP SECTION (CDM-3325ES)
6
spring (upper lid-2702)
5
battery terminal board (relay)
3
claw
2
three screws
(B2)
2
four screws
(B2)
1
screw (B2)
4
cabinet (upper) sub assy
Note: On installation of cabinet (upper) sub assy,
adjust the position of two switches
(S802, S803) and two knobs (GPRO).
knob (GPRO)
S802
3
claw
3
claw
S803
4
cabinet (lower) assy
6
main board
1
cushion
5
flexible board
(CN503)
7
two insulators
7
insulator
8
optical pick-up section
(CDM-3325ES)
1
cushion
2
two connectors
(CN501, CN502)
3
Hold up both the main board and the
optical pick-up section at once, and remove
them from the cabinet (lower) assy.
Note: Handle the flexible board with care when
you hold up the optical pick-up section.