51
KDL-26S3000/32S3000/40S3000/46S3000
KDL-26S3000/32S3000/40S3000/46S3000
KDL-32S3000 ONLY
1. Route 40P LVDS Cable between
BU-Bd and TCON as shown.
2. Apply 3x8mm Screw (2-places) to ground
LVDS cable.
Put Attention on Routing of Cable.
G1 to BU cables are on TOP of LVDS.
H3-Bd cables are UNDER LVDS.
3mm TORQUE: 6.0kg-cm (+-1.0kg-cm)
OPERATION PROCESS
TORQUE SPECIFICATION
NOTE: LVDS Cable is UNDER G1/U-Bd cables
NOTE: LVDS Cable is ON TOP of H3-Bd Cables
1
2
2
LVDS CABLE