6.12 Sealing
The sealing concept is subject to country-specific regulations. The sealing scheme shown
here is built in to the Supercal 5 I.
Ex factory the Supercal 5 I is unsealed. The following installation steps must be carried out:
Installing it to its final operating location
Installing the two temperature sensors
Installing the power supply if required
Connecting the flowmeter to the Supercal 5 I
Then the Supercal 5 I must be sealed by using the menu on the display according to chapter 7.
The installer can modify any other metrological parameter with Superprog Android and
Superprog Windows at any time.
Once the unit is sealed, in order to return to commissioning mode or to the
un-sealed
state,
the seal must be broken as pictured below:
6.13 Nowa / Unicon
See chapter 11.11 Nowa/Unicon
6.14 Save Operating Data
6.14.1 Data Backup
The Supercal 5 has a non-volatile FRAM for data storage.
The data is thus retained even in the event of a power failure. All values are automatically
updated and saved.
The historical data is organized in:
Four totalizers
One average value
One maximum value
One historical event
For each set of historical data, some customization is available:
Maximum number of records
Recording frequency
Summary of Contents for Supercal 5 I
Page 1: ...Instructions for Use Supercal 5 I...
Page 6: ...6 Instruction for use Supercal 5...
Page 55: ...55 Instruction for use Supercal 5 The interfaces of the NOWA adapter...
Page 66: ......
Page 67: ......