Operating Manual | 4 Preparing a work order
SONO-PR 200
27 / 47
Revision: 2.0 | 2022-10-14
4
Preparing a work order
This section describes preparations and settings that are necessary and/or useful before
processing a work order. The content structure and order follow the typical (recommended)
work flow.
Before you begin
Before starting up the device, make sure that:
•
the device has no visible damage,
•
the connection cables have no visible damage,
•
all connection cables are fitted with matching plugs and
•
none of the probes shows visible damage.
4.1
Positioning
Location
Always make sure that the installation site adheres to the stipulated ambient conditions (see
"7 Technical data", page 42).
Positioning options
Usage
Stipulation
As independent device
Place the SONO-PR 200 on a level, non-slip bearing surface.
Within a 19 inch equipment rack
Secure the SONO-PR 200 within the 19 inch equipment rack to
prevent shifting, slipping or falling.
Observe free accessibility!
Always position the device in a way that gives free access to the On/off switch and all
connections.