Commissioning | 11
KD-557 | 1000241 | EN | 02
81 / 100
11.2.2 Filling in the commissioning report
Complete the commissioning report in the appendix of the document in full.
Make a copy of the filled in commissioning report, the original remains with the oper-
ator.
Send a scan of the commissioning report to the following e-mail address within 5 work-
ing days:
11.2.3 Taking photos to document installation
The photo upload is obligatory for both offline commissioning and online com-
missioning.
To fully document the installation, photos of the finished installation must be taken and
send to sonnen.
1.
Take the described photos of the storage system (see Installation photos [P. 92]).
2. Go to the following website:
sonnensupportaustralia.com.au
3. Navigate to Reference > System Commissioning.
4. There the photos can be uploaded, using the procedure described.
5.
Alternatively
the photos can be send to the following e-mail address: