PAT-806-IT
– USER MANUAL
9
Press
ENTER
.
Use
,
buttons to set mains
type (
or
).
Press
ENTER
to confirm your
choice, press
ESC
to exit to the
main menu.
3.3 Start test after switching the meter on
After switching on, the meter performs self-test to check its correct operational condition and
when this test is successfully completed, the meter automatically performs the following measure-
ments:
measurement of the voltage in the power supply socket, i.e. the voltage between L and N of
power supply to the meter
measurement of mains frequency
checking the continuity PE in the power supply socket
measuring the voltage between N and PE in the power supply socket
When everything is correct the following screen is displayed:
Summary of Contents for PAT-806-IT
Page 1: ......
Page 2: ......
Page 74: ...PAT 806 IT USER MANUAL 72 NOTES...
Page 75: ......
Page 76: ......