background image

Chapter 4   Maintaining the Switch

Caution:

• Before opening the chassis, make sure that you have released the static you  carried and the

n turn off the power on-off of the switch. Before operating any step  in Appendix B, read the s
ection “Safety Advice”.

• Before performing operations beside the power source or on the chassis, turn off  the power 

on-off and plug out the power cable.

4.1

Opening the Chassis

This section describes how to open the cover of the switch, required tools and  operation
methods.

Caution:

When the power cable still connects the power source, do not touch it.

When you open the cover the switch, you may use the following tools: These tools are:

• Crossed screwdriver
• Static armguard

Perform the following steps to open the cover of the switch:

1) Turn off the power on-off of the switch.
2) Plug out all cables connected the back of the switch.
3) Take out the bolt from the chassis with the screwdriver.

Note:
The chassis comprises of two parts: cover and bottom.

4)  Open the cover by holding two sides of the cover towards the direction of the  arrow key shown 

in the following figure:

Note: The switch shown in the previous figure does not represent real SFC4254T switch.
5)  When the cover is opened, put it aside. The mainframe of the system appears.

Note:

After taking off the cover, put it horizontally and avoid it to be crushed or collided.  Otherwise, 
the chassis is hard to install.

SFC4254T Hardware Installation Manual

Summary of Contents for SFC4254T

Page 1: ...SFC4254T Hardware Installation Manual...

Page 2: ...1 1 Front template of the SFC4254Tswitch Table 1 2 Parts at the front template of the SFC4254T switch Port Features Gigabit Ethernet port UTP RJ45 port with the LINK ACT indicators Gigabit Ethernet po...

Page 3: ...IEEE 802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Hardware features Memor...

Page 4: ...nal laws and regulation s or send these products to our company for collective processing 2 2 Safety Advice 2 2 1 Safety Principles Keep dustless and clean during or after the installation Put the cov...

Page 5: ...wer line before installing or uninstalli ng the chassis or working beside the power Do not work alone if potential dangers exist Cut off the power before checkout If trouble happens take the following...

Page 6: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must ha ve the heat discharge outlet and the co...

Page 7: ...ovided by the SFC4254T switch You yourself need to prepare them The following are the tools and devices needed for the typical installation of the SFC4254T switch Screwdriver Static armguard Bolt Ethe...

Page 8: ...be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the switch 3 1 2 Installing the Chassis on the Cabinet The chassis of the switch is fix...

Page 9: ...T switch Table 3 1 Definition of the pins of the console port Note Because the console port of SFC4254T bears no flow control you need to set Data flow control to none when using a superior terminal t...

Page 10: ...100 1000Base T ports The indicators are labeled with number s 1 48 indicating the link ACT state of the port You can connect other Ethernet terminal devices to the UTP port through the cut through or...

Page 11: ...the function of auto identification so the five classes of direct through cross network cables can be used to connect other Ethernet devices 3 3 Checkup AfterInstallation Before electrically starting...

Page 12: ...ou may use the following tools These tools are Crossed screwdriver Static armguard Perform the following steps to open the cover of the switch 1 Turn off the power on off of the switch 2 Plug out all...

Page 13: ...oint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and sc...

Page 14: ...us degrees If the switch cannot be started and the PWR LED is off check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault If the port of...

Reviews: