Installation
3-1
SkyWay-EB Series
3. Deployment
This section describes step-by-step procedures to prepare the mounting and installation of a SkyWay-EB
link.
3-1. Site Preparation
The following preparations should be considered prior to installing the SkyWay-EB units.
Line of Sight
Absolute ling of sight (LOS) is necessary for proper operation of the link. Though the Fresnel zone for
millimeter waves is fairly small, a minimum of 1 meter of clearance on a rooftop is recommended.
Mast
The mast for unit installation must be fi xed on solid foundation. Vibrations caused by wind may
degrade the link performance or even cause link downage.
Site Permission
The installation location should be approved by the building owner or superintendent. Installation
methods and wiring of various cables must meet local requirements.
Cable Length
The installer must determine the total length of the cable run between the radio unit and the connection
point for power, data, and management cables.
3-2. Tools and Equipment
The following tools and equipment are needed to install SkyWay-EB units. Installers should check the
following prior to installation:
Fish Tape
A steel fi sh tape will be needed to pull various cables through the conduit. An example is shown in Fig. 1
below.
Figure 3-1 Steel Fish Tape