background image

 

I

PV  Connection

Grid and

 

 Off-grid Connection

Tool

 

Preparation

 

Quick Installation Guide

                 *

1

8AWG European 
terminals

*

3

X1-Hybrid G4
series inverter.

Bracket

Waterproof cover*1

          

PV terminal 

(positive*2 , negative*2  )

Waterproof connector 
with RJ45

*

4/3

(

Meter/

DRM)

RJ45 terminals

*

1

 

 

10AWG European 

                  terminals

*2

(Expansion bolt ,Gasket,
Self-tapping bolt)*3

Battery connection 
terminals 

*

1

Warranty

 

Card*1

 

       Manual

*

1

 

OT terminal*1

M5 inner hexagon bolt*1

                 CT*1

            Pocket WiFi*1

 Meter 

*

1(Optional)

Hammer drill

Bit 

φ

10)

Socket

 

wrench

 

set(Hexagon)

(Crosshead M5)

Torque screwdriver

Diagonal pliers

Utility knife

Diagonal pliers

Multifunction terminal crimping
 tool (RJ45)

 

Rubber hammer

OT terminals press clamp

             (

0.5~6

mm

²)

 

 

Tape ruler

Euro terminal crimping tool

Hexagon keys

Spirit level

 

a)

a ) Use a marker to mark drilling holes of the 
bracket on the wall .   

b) 

Φ

10

 Hammer 

drill

c) 

d)

Expansion 
bolts

Screw

 d ) The bracket is aligned with the screw uses 
the inner hexagonal wrench to screw the 
tapping screw until the expansion bolt 
"bang" is heard.

 

Rubber hammer

Torque :

2

.

5

±

0

.

2N

·

m

80.00 m

m

c) Insert expansion bolt into the hole, use 
rubber hammer to knock the expansion 
screw bolt into the wall. 

e)

f)

 f ) Use the inner hexagonal wrench to tighten 
the inner hexagonal screw on the right side of 
the inverter.

             Hexagon keys

Torque :

1

.

2

±

0

.

1N

·

m

 

e) Hang the buckle on the inverter to the 

corresponding position of the backplane

.

7.0

mm

Step 1. Turn off the DC switch, connect the PV module, prepare a 
12AWG PV  cable, and find the PV (+) terminal and PV (-) terminal in 
the package.

Step 2. Use a wire stripper to strip the 7mm insulation layer of the wire 
end.

Wire stripper

Step 4. 

Tighten the fastening head and into insert the corresponding positive and negative (PV-/PV+) ports of the inverter.

Crimping Tool

Negative 

Positive 

PV1+

PV2+

PV1- PV2-

I

Battery

 

Connection

Step 1. Prepare a Grid cable (three-core wire) and an Off-grid cable (two-core wire), and then find the European terminal and waterproof cover in 
the accessory bag.

Step 2: The Gridand Off-grid cables go through the corresponding Grid and Off-grid ports of the waterproof cover. Remove the 12mm insulation 
layer at the end of the wire. Insert the European-style terminals respectively, and make sure that the stripped ends are inserted into the 
European-style terminal ,and finally use crimping pliers to press tightly.

High voltage lithium battery

+

-

CAN/RS485

Non-polar 
DC MCB
 

Power line connection

 

Communication line connection

 

... ...

 ON

 OFF

PV 1

PV 2

BAT

BMS 
  

CAN

DRM
  

Upgrade
  

DONGLE
 
  

METER/CT 
  

COM/LCD
  

Note:
When using SOLAX batteries, 
the recommended  number of 
battery modules(HV10045/HV10063/HV10058) is 
1-3 units, and battery controller MC0500unit.

 

8 AWG

15

.0m

m

Crimping Tool

Step 2. Insert the stripped cables into the  DC plug (-) and DC Plug (+) respectively.

Step 3. Press down on the spring by hand, you can hear a click sound, then push the 
ends together, and tighten the screw joints.

Step 1. Prepare 8 AWG battery power line , find the DC 
plug (+), DC plug (-) in the accessory bag.

Step 4. Insert the battery power lines into the corresponding BAT port (+), (-) of the 
inverter.

  

          

Note!

After the BMS communication between the battery 
and the inverter is finished, the battery will work 
normally.

Quick Installation Guide

X1

-

Hybrid 3.0KW-7.5KW 

Packing List

Mounting Steps

Marker

 

Note: 

 ”

attachments are not included in the M-series inverter attachment package and will be included in the X1-Matebox.

is the standard accessory in the M-series inverter and the optional accessory in the D-series inverter.

"▲"

“   ” The inverter in Australia needs to be connected to DRM, which is 1 more communication line adapter than that in other countries, while the other countries only need 2 

communication line adapters.

X1-Hybrid Series 3.0KW-7.5KW

X1-Hybrid User Manual

3.0kW - 7.5kW

EN

  b) Drill holes at marked spots with depth of 80mm.

PV cable

PV pin

Negative terminal
Positive terminal

Positive PV pin

Negtive PV pin

Step 3. 

The PV connector is divided into 2 parts, to the plug and the fastening head.Pass the cable through the fastening head and the 

alignment plug.Note that the red and black lines correspond to different pairs of plugs.Finally, force the cable into the plug and hear a
 "click" to indicate that the connection is complete.

Positive metal 
terminal

Negative metal 
terminal

Positive terminal

Negative terminal

Diagram A: Neutral line and PE line are separated from

 

each other, and 

the common load is connected to the off-grid port;(For most countries)

Diagram B: Neutral line and PE line are separated from

 

each other, 

all loads connect to the Off-grid port;(For most countries)

10AWG

 

Euro

 

Terminal

*

2

Waterproof cover

Grid( Triple

 

Core

 

Cable)8AWG

*

3

Off-grid( Double

 

Core

 

Cable)10AWG

*

2

Eurp Terminal 8AWG *3

Battery connection diagram:

Diagonal
pliers

BAT plug (+)                BAT plug (-)

Power line

DC plug (-)

DC plug (+)

Spring

Cavity

The cable must pass through here

Spring

Spring

Crack!

Note: BAT port, not PV port!

Note: The positive and negative
wires of the battery are not 
allowed to be reversed!

DC Voltage range ≥1100 V DC

Grid Cable and Micro-breaker recommended

Cable (copper)

Micro-Breaker

Model

X1-Hybrid-3.0-D X1-Hybrid-3.7-D X1-Hybrid-5.0-D X1-Hybrid-6.0-D

3-4mm

²

3-4mm

²

4-6mm

²

4-6mm

²

50A

Off-grid Cable and Micro-breaker recommended

Cable (copper)

Micro-Breaker

Model

X1-Hybrid-3.0-D

X1-Hybrid-3.0-M

X1-Hybrid-3.7-D

X1-Hybrid-3.7-M

X1-Hybrid-5.0-D

X1-Hybrid-5.0-M

X1-Hybrid-6.0-D

X1-Hybrid-6.0-M

4-6mm

²

6-8mm

²

8-10mm

²

8-10mm

²

25A

25A

32A

32A

50A

40A

32A

X1-Hybrid-7.5-D

6-8mm

²

50A

X1-Hybrid-7.5-D

X1-Hybrid-7.5-M

8-10mm

²

40A

             PV pin angle

(positive*2 , negative*2  )

 

Diagram C: Neutral line and PE line are combined togeter, and the 
common load is connected to the off-grid port;(Apply to Australia)

Diagram D: Neutral line and PE line are combined together,

 

all 

loads connect to the Off-grid port;(Apply to Australia)

N

BAT

Battery

N-BAR for loads

N-BAR for off-grid loads

off-grid loads

Loads

X1-Hybrid G4

PV 1

PV 2

E-BAR

RCD

Breaker

Grid

Breaker

Grid

Off-grid

Main Breaker

B

re

a

k

e

r

B

re

a

k

e

r

CT

CT

B

re

a

k

e

r

PE

RCD

X1-Matebox

CT

Distrbution Box

Battery

Grid

Off-grid

PV 1PV 2

E-BAR

Grid

B

re

a

k

e

r

Loads

N-BAR for loads

N

Main Breaker

BAT

X1-Hybrid G4

PE

X1-Matebox

CT

Distrbution Box

Battery

Grid

Off-grid

PV 1PV 2

E-BAR

Grid

B

re

a

k

e

r

Loads

N-BAR for loads

N

Main Breaker

BAT

X1-Hybrid G4

N

BAT

Battery

N-BAR for loads

N-BAR for off-grid loads

off-grid loads

Loads

X1-Hybrid G4

PV 1

PV 2

E-BAR

RCD

Breaker

Grid

Breaker

Grid

Off-grid

Main Breaker/RCD

B

re

a

k

e

r

B

re

a

k

e

r

CT

CT

B

re

a

k

e

r

RCD

Grid

Off-grid

L=12mm

L

Grid

Off-grid

Torque screwdriver

  ( Torque: 0.2±0.1N

·

m)

GRID

Off-grid

L N PE L N

Cable (copper)

Micro-Breaker

Model

X1-Hybrid-3.0-M X1-Hybrid-3.7-M X1-Hybrid-5.0-M X1-Hybrid-6.0-M X1-Hybrid-7.5-M

3-4mm

²

3-4mm

²

4-6mm

²

4-6mm

²

25A

25A

32A

32A

6-8mm

²

40A

The PV port wiring of X1-Hybrid G4 M series inverter has been completed. On X1-Matebox, the D series needs to be wired according to 
the following steps.

The Grid and Off-grid ports of X1-Hybrid G4 M series inverter have

 

been connected, and the D series needs to be wired according to the following 

steps.

Battery  port  connection  line  of  the  X1-Hybrid  G4  M  series 
inverter is on the X1-Matebox, just connect it. It is necessary to 
wire the D series according to the following steps.

Reviews: