X3-Matebox
Quick Installation Guide
1. Introduction
2. Overview
A
Load
Grid
Meter
B C
D
E
F
G
H
I
551 mm
500 mm
5
1
2 m
m
204.5 mm
J
B
A
Load
PV
Object
Name
D
C
Grid(INV)
Grid
F
E
BAT
I
H
Off-grid (INV)
G
BAT(INV)
PV (INV)
Description
PV connection port (PV
array)
Load connection port
Grid output port
of the inverter
Battery connection port
(to
battery
pack)
Battery connection port of the inverter
PV connection port of the inverter
Grid
connection port (to local grid)
Off-grid output port
of the inverter
J
DC Switch
DC switch
Meter
Meter
2) Electrical schematic diagram
1) Dimension and terminals of X3-Matebox.
- Packing Lists
3. Preparation
4. Mounting
Note :When installing the bracket, be sure to use a
level to test and keep the bracket parallel to
spirit
the horizontal plane.
Bracket A should be installed at a distance of 300mm (at least) from the ground.
Step 1: Bracket installation
Fasten the brackets to the wall, according to the following steps.
d)
a) Use the bracket as a template to mark the two holes on the
wall with a marker pen. Drill holes at marked spots with depth
of 80mm.
Step 2: Screw the brackets on the wall
Use a level firstly to ensure that the brackets in the system are firmly installed and level. Then follow the
steps below to hang X3-Matebox.
Step 3. Match the X3-Matebox with the brackets
Open the upper cover and the isolation plate of X3-Matebox before wiring.
Mount X3-Matebox on brackets and tighten the screws.
c ) The bracket is aligned with the screw uses the inner
hexagonal wrench to screw the tapping screw until the
expansion bolt "bang" is heard.
b)
Expansion
bolts
Rubber hammer
Torque :2
.
5
±
0
.
2N
·
m
a)
Φ
10 drill
80.00 m
m
b) Insert expansion bolt into the hole, use rubber hammer to
knock the expansion screw bolt into the wall.
Screw
Inner
hexagonal
wrench
c)
Inverter bracket
Monkey Wrench
Torque: 1.5±0.2N
·
m
(1)Fix the inverter bracket on
the bracket B;
Monkey Wrench
Torque: 1.5±0.2N
·
m
(2)Then set the bracket B on the
bracket A and fix it with screws;
>
300mm
- Tools
Diagram A: N line and PE line separate wiring, M series inverters;
(For most countries)
Diagram B: N line and PE line together, M series inverters;
( Applicable to Australia)
X3-Matebox is a critical part for SolaX energy storage system, which
integrates the DC breaker/AC breaker/switch unit/Meter and so on,
it can easily be installed compare to the traditional separate system,
this unit can be used with SolaX X3-Hybrid G4 and X3-Fit G4 series
inverters.
There are 2 wiring diagrams for your system connection reference,
please follow your local policy to chose which one is suitable for
your side.
Philips
Screwdriver
torque:1.5±0.2N m
·
d) The Matebox should be prioritized over the installation of
the inverter. Before installing the inverter, you need connect
the ground wire and the Dongle (communication
accessories)
Sealing rubber ring *2
N-terminal adjacent
bridge *1
(for AU market)
Bracket A *1
Bracket B *1
10AWG terminals *8
Flange nut *2
(Expansion bolt ,
Gasket ,Self-tapping
bolt) *2
6AWG
*1
OT terminal
6AWG Ground terminal*1
6AWG terminals *10
C
Of
f-grid
Loads
Grid
Grid
PV
Inverter
Battery
Inverter
BA
T
A1
A2
NC
NC
A1
A2
Inverter
METER
L2
L1
L3
N
L2
L1
L3
N
Met
er
N
T
S
R
R
N
T
S
R
S485
N-BAR
E-BAR
O
ff
-g
ri
d R
C
M
C
B
G
ri
d
(I
N
V
) M
C
B
B
a
tt
e
ry M
C
B
N-BAR
PV
Array
D
C S
w
it
c
h
2
X3-Matebox
BAT
Battery
X3-Hybrid G4
PV
Grid
Off-grid
N
E-BAR
Grid
Main Breaker/RCD
Meter
N-BAR for off-grid loads
off-grid loads
B
re
a
k
e
r
BAT
Battery
X3-Hybrid G4
PV
Grid
Off-grid
Meter
X3-Matebox
E-BAR
N
N
E-BAR
Grid
Main Breaker/RCD
N-BAR for off-grid loads
off-grid loads
B
re
a
k
e
r
Matebox
Load
Grid