SolaX Power X3-Matebox Quick Start Manual Download Page 1

1

X3-Matebox

Quick Installation Guide

1. Introduction

2. Overview

A

Load

Grid

Meter

B C

D

E

F

G

H

I

551 mm
500 mm

5

1

2 m

m

204.5 mm

J

B                      

A                     

Load

PV

Object

Name

D                      

C                     

Grid(INV) 

Grid

F                      

E                     

BAT

I                      

H                     

Off-grid (INV)

G                      

BAT(INV)

PV (INV)

Description

PV connection port (PV

array)

Load connection port 

Grid output port

of the inverter

Battery connection port

(to

battery

pack)

Battery connection port of the inverter

PV connection port of the inverter

Grid

connection port (to local grid)

Off-grid output port

of the inverter

J                      

DC Switch

DC switch

Meter

Meter

2) Electrical schematic diagram

1) Dimension and terminals of X3-Matebox.

 - Packing Lists

3. Preparation

4. Mounting

Note :When installing the bracket, be sure to use a 

level to test and keep the bracket parallel to 

spirit 

the horizontal plane.
Bracket A should be installed at a distance of 300mm (at least) from the ground.

Step 1: Bracket installation

 

Fasten the brackets to the wall, according to the following steps. 

d)

 a) Use the bracket as a template to mark the two holes on the 
wall with a marker pen. Drill holes at marked spots with depth 
of 80mm.

Step 2: Screw the brackets on the wall 

Use a level firstly to ensure that the brackets in the system are firmly installed and level. Then follow the 
steps below to hang X3-Matebox.

Step 3. Match the X3-Matebox with the brackets

Open the upper cover and the isolation plate of X3-Matebox before wiring.

Mount X3-Matebox on brackets and tighten the screws.

 c ) The bracket is aligned with the screw uses the inner    
hexagonal wrench to screw the tapping screw until the 
expansion bolt "bang" is heard.

b) 

Expansion 
bolts

 Rubber hammer
Torque :2

.

5

±

0

.

2N

·

m

a) 

Φ

10 drill

80.00 m

m

b) Insert expansion bolt into the hole, use rubber hammer to 
knock the expansion screw bolt into the wall. 

Screw

Inner 
hexagonal 
wrench

c) 

Inverter bracket

Monkey Wrench
Torque: 1.5±0.2N

·

m

(1)Fix the inverter bracket on 
the bracket B;

Monkey Wrench
Torque: 1.5±0.2N

·

m

(2)Then set the bracket B on the 
bracket A and fix it with screws;

300mm

 - Tools

Diagram A: N line and PE line separate wiring, M series inverters;
(For most countries)

Diagram B: N line and PE line together, M series inverters;
( Applicable to Australia)

X3-Matebox is a critical part for SolaX energy storage system, which 
integrates the DC breaker/AC breaker/switch unit/Meter and so on, 
it can easily be installed compare to the traditional separate system, 
this unit can be used with SolaX X3-Hybrid G4 and X3-Fit G4 series 
inverters.

There  are  2  wiring  diagrams  for  your  system  connection  reference, 
please  follow  your  local  policy  to  chose  which  one  is  suitable  for 
your side.

Philips
Screwdriver
torque:1.5±0.2N m

·

d) The Matebox should be prioritized over the installation of 
the inverter. Before installing the inverter, you need connect 
the ground wire and the Dongle (communication 
accessories)

Sealing rubber ring *2

N-terminal adjacent 
bridge *1

(for AU market)

 Bracket A *1

 Bracket B *1

10AWG terminals *8 

Flange nut *2

(Expansion bolt ,
Gasket ,Self-tapping 
bolt) *2

6AWG 

*1

OT terminal  

6AWG Ground terminal*1

 

6AWG terminals *10 

C

Of
f-grid

Loads

Grid

Grid

PV

Inverter

Battery

Inverter

BA
T

A1

A2

NC

NC

A1

A2

Inverter

METER

L2

L1

L3

N

L2

L1

L3

N

Met

er

N

T

S

R

R

N

T

S

R

S485

N-BAR

E-BAR

O

ff

-g

ri

d R

C

M

C

B

G

ri

d

(I

N

V

) M

C

B

B

a

tt

e

ry M

C

B

N-BAR

PV 

Array

D

C S

w

it

c

h

2

X3-Matebox

BAT

Battery

X3-Hybrid G4

PV

Grid

Off-grid

N

E-BAR

Grid

Main Breaker/RCD

Meter

N-BAR for off-grid loads

off-grid loads

B

re

a

k

e

r

BAT

Battery

X3-Hybrid G4

PV

Grid

Off-grid

Meter

X3-Matebox

E-BAR

N

N

E-BAR

Grid

Main Breaker/RCD

N-BAR for off-grid loads

off-grid loads

B

re

a

k

e

r

Matebox

 Load

 Grid

Reviews: