Step 3
:
Step 1: Using the bracket as a guide, mark the positions of the twelve holes.
II
- Position the top side of the inverter on the small hook of the bracket.
- Position the bottom of the inverter to lean on the bracket.
- Press the inverter slightly towards the hole to install it rmly.
A1
User Manual x1
Warranty Card x1
A1-Hybrid 6.0KW- 8.6KW
Quick Installation Guide x1
Wi-Fi Module x1
I
III
Grounded bus-bar
IV
- The A1-Hybrid series inverter can be connected with PV modules in series with 2MPPTs for 6.0kW, 3 MPPTs for 7.0kW and 7.6kW, and 4 MPPTs for 8.6kW.
For wiring method, refer to Section III.
PV Connection
Grid Connection
For wiring method, refer to Section III.
2 L-lines and 1 N-line connect to the Grid terminal through one port.
VI
BMS Cable Connection
For wiring method, refer to Section III.
1 CAT5 network cable connects to the BMS terminal on the communication board.
Electrical Cable Connection
1 positive-line and 1 negative-line connect to BAT terminal through one port.
TRIPLE
POWER
TRIPLE
POWER
TRIPLE
POWER
+_
+ _
+ _
+ _
+
_
Grounded busbar
Batter
y Break
er
V
- The A1-Hybrid Series inverter can deliver output power through the load port when there is an outage.
- An autotransformer must be connected to the inverter if a user wants to use this function.
- User should select appropriate critical loads to connect to the load port. Read the user manual carefully before
selecting critical loads requirements.
2 L-lines and 1 N-line through one port;
2 L-lines and 1 N-line connect to LOAD terminal through one port.
Load Connection
2 L-lines and 1 N-line through one port;
2 L-lines and 1 N-line connect to TXS terminal through one port.
Auto-Transformer Connection
For wiring method, refer to Section III.
Load Connection
L1 N L2
LOAD
Auto-Transformer Connection
L1 N L2
TXS
Meter x1
CT x2
Inverter x1
Bracket x1
(for mounting)
Expansion Tube x12
(for mounting)
Expansion Screw x12
(for mounting)
3 PIN Terminal x1
2 PIN Terminal x1
Cord End Terminal
8.6KW x19; 7.6KW x17
7.0KW x17; 6.0KW x15
2-pole, 40A 120/240 VAC, 10kA
Grid Breaker Requirements
A1 Hybrid-6.0-US
Inverter Model
Recommended AC Branch Protection
A1 Hybrid-7.0/7.6-US
2-pole, 35A 120/240 VAC, 10kA
2-pole, 45A 120/240 VAC, 10kA
A1 Hybrid-8.6-US
Required Torque
Permitted Wire Size
Plug-in
8AWG,600V,194
℉
/90
℃
for A1 Hybrid-6.0/7.0-US
6AWG,600V,194
℉
/90
℃
for A1 Hybrid-7.6/8.6-US
120V/240V Split-phase
L1, N, L2
Battery Breaker Requirements
Recommended DC Branch Protection
35A, 600Vdc, 35kA
Terminal: Rj45, 8
-
conductor
Cable: CAT5 non
-
crossover network cable
Cable Requirement
15
.
75 in
/400mm
11
.
81 in
/300mm
11
.
81
in
/300mm
11
.
81
in
/300mm
29
.
53 in
/750mm
- Drill holes (depth of at least 2.36in/60mm) with a φ10 drill.
Step 2
:
- Mount the bracket and tighten the expansion tubes. Then screw the expansion screws.
Part
Required Torque
Mounting Expansion Screw (x12)
92 lbf-in
Required Torque
Permitted Wire Size
Plug-in
8AWG,600V,194
℉
/90
℃
for A1 Hybrid-6.0/7.0-US
6AWG,600V,194
℉
/90
℃
for A1 Hybrid-7.6/8.6-US
2-pole, 40A 120/240 VAC, 10kA
Load Breaker Requirements
A1 Hybrid-6.0-US
Inverter Model
Recommended AC Branch Protection
A1 Hybrid-7.0/7.6-US
2-pole, 35A 120/240VAC, 10kA
Manual Bypass Breaker Requirements (optional)
A1 Hybrid-6.0-US
Inverter Model
Recommended AC Branch Protection
A1 Hybrid-7.0/7.6-US
double-pole double-throw
120/240VAC, 40A, 10kA
double-pole double-throw
120/240VAC, 35A, 10kA
2-pole, 45A 120/240 VAC, 10kA
A1 Hybrid-8.6-US
A1 Hybrid-8.6-US
double-pole double-throw
120/240VAC, 45A, 10kA
Step 1: Turn the DC switch to the “OFF” position. Remove the 8 cover screws, then remove the
cover.
Step 2: The conduit plugs (circled in blue) should be removed by the operator before
connecting the wires.
Step 3: Operator should use the standard size conduit which must fit the holes on the bottom
of the inverter. Conduit fittings must be watertight.
DC Switch
Max. 1.4 lbf- in
Max. 23 lbf- in
1G Waterproof Plugs x8
3/4G Waterproof Plugs x3
1G
3/4G
1G
1G
1G
1G
1G
3/4G
3/4G
1G
Conduit
Wirings
Conduit
0.47in/12mm
Wirings
Step 4:
4.1 Choose the appropriate wire according to the specific connection.
4.2 Remove 0.47in/12mm of the insulation from the end of the DC wire (the AC wire
shall be removed by 0.71 in/18mm).
4.3 Insert the end of wires into the Cord End Terminal, and then use the crimping
pliers to crimp the Cord End Terminal tightly (the shape will be square).
4.4 Using the slot screwdriver to compress the orange button of the terminals,
insert the stripped wires into terminal and ensure that all conductor strands are
captured in the terminal.
4.5 Loosen the slot screwdriver.
Slot Screwdriver Type
SL 3
Removing Wiring Box Cover Screw Torque
Removing Conduit Plug Torque