background image

Subject to change | © 2020 SOLARWATT GmbH | AZ-TM-PME-1787 | Rev 000 | Version: 03/2020

Page 32

Troubleshooting

The MyReserve’s Status LED will light up red or red/yellow 
to indicate any malfunctions. Under certain circumstances 
(and after consulting with your installer), some error codes 
can be resolved by simply restarting the system manually. 
To do this, interrupt the power supply to the MyReserve 

using the switch on the bottom of the MyReserve Com-

mand  (see  figure  under  „Components  and  construction“: 

AC power supply switch) wait 60 seconds, then switch the 
AC power on again. 

Critical states

If any of the following critical situations develop, open a window, immediately leave the installation location, close the door, 
and then call the emergency services.

Warning of fire-

explosive substances

Warning of danger

from batteries

Warning of potentially

explosive substances

• 

Electrolyte leaking out

• 

Strong, pungent smell

• 

Development of smoke

• 

Storage battery burning

Immediately leave the installation location and then call 
the emergency services

UK: 999/112
AUS: 000

       NOTE

After a restart of MyReserve, an initialization with calibration and check of the start conditions takes place (a 
PV-surplus must be measured once).
Unloading will not occur until the following day after MyReserve has detected a minimum surplus of PV energy. 

 

DANGER

Defective batteries can result in harmful or even fatal hazards. 

Should you discover one or more defective battery modules leaking electrol-

yte and/or emitting an unpleasant smell, contact  SOLARWATT immediately.

Do not approach the battery modules under any circumstances.

Defective batteries can cause explosions. They represent a danger to life 

and limb.

Summary of Contents for MyReserve 25 Series

Page 1: ...MyReserve 25 DE EN IT Benutzerhandbuch User Manual Manuale di istruzioni per l uso...

Page 2: ...teristics of MyReserve 23 Charging behavior 25 Direct supply from PV 26 Direct supply from PV and charge battery 26 Direct supply from PV charge battery infeed 26 Direct supply from PV and discharge b...

Page 3: ...r guide is valid for the MyReserve 25 manufactu red by SOLARWATT GmbH Limitation of liability SOLARWATT GmbH assumes no liability for injury to per sons damage to the product or other property or cons...

Page 4: ...nd immediately decom mission them if any defects are found Never ground the MyReserve with a lightning conduc tor telephone wire or gas line The temperature of the MyReserve Command housing can increa...

Page 5: ...GmbH by post after 2 to 3 weeks After the MyReserve has been commissioned your installer will hand over the commissioning log to you This confirms that all installation conditions have been complied...

Page 6: ...hat pays off PV Anlage Speicher Wechselrichter Verbraucher PV Anlage Wechselrichter Speicher Verbraucher 90 usable energy 75 usable energy PV panels Inverter Battery Household appliance STANDARD BATTE...

Page 7: ...t and flooding for 5 years Individuality through modularity MyReserve fits your requirements because its modular design allows it to be configured individually Five battery modules can be connected pe...

Page 8: ...ptimum charging and dischar ging times using a self learning algorithm that processes energy generation and energy consumption in the house hold This is because if the battery switches to charging ear...

Page 9: ...ning or late evening hours Direct supply from PV and charge battery If the PV system generates more energy than your house hold requires 2 kW generated 1 kW household the My Reserve will begin chargin...

Page 10: ...arging can start again The charging takes place with at least 50 of the PV po wer If the AC sensor measures a feed into the grid i e the household uses less than the remaining 50 of the PV power MyRes...

Page 11: ...g The MyReserve Command cools down via the surface of the aluminum housing and trough the room temperature A heat development of 60 C can occur on the MyReserve Command NOTE There are no limitations o...

Page 12: ...icators for Status and Performance Check the indicators at any time for information regarding device status and current char ging state See chapter Troubleshooting for information on what to do in cas...

Page 13: ...erve App MyReserve App f r iOS MyReserve App f r Android Instructions for setting up the MyReserve App are available in the download area of www solarwatt com With the MyRe serve App customers can see...

Page 14: ...att com menu item Energy Management you can get to know and test the EnergyManager Portal The charging strategy of the MyReserve is designed for the longest possible service life This results in 3 000...

Page 15: ...services Warning of fire explosive substances Warning of danger from batteries Warning of potentially explosive substances Electrolyte leaking out Strong pungent smell Development of smoke Storage ba...

Page 16: ...to learn when and how much surplus electricity will be available to charge the battery The charging process is distributed over the course of the day and completed at sunset which is particularly gen...

Page 17: ...ste Particular care must be taken when disposing of the MyReserve and it s batteries For information regarding safe and environmentally friendly disposal of your MyRe serve or batteries contact your S...

Reviews: